Laserfiche WebLink
<br /> .~ <br /> 'e SUPPLEr~ENT TO. EXHIBIT A . <br /> Date: March 29, 1977 <br /> RE: Feasibility Report for Town of Hudson <br /> Job No. 1051-1-1 <br /> COST ESTIMATE FOR PREPARATION OF REPORT <br />GENERAL DESCRIPTION OF WORK ITEM COST & MAN HOUR AMOUNT INCLUDING <br /> BREAKDOWN EXPENSES <br />a. Accumulate, review and prepare P .E. 20 hr @$25.50 = $510 <br /> on the water system and town E.T. 6 hr @ 15.50 = 93 <br /> for items noted for prefacing S.D. 4 hr @ 14. 50 = 58 <br /> ma teri aI, genera 1 information, Exp. 89 $ 750.00 <br /> etc. <br />b. Review and evaluate existing P.E. 16 hr @ 25.50 = 408 <br /> wa ter sys tem E. T. 4 hr @ 15.50 = 62 <br /> Exp. 30 $ 500.00 <br />c. Review and evaluate existing P.E. 80 hr @ 25.50 = 2,040 <br /> and proposed water requirements, E.T. 12 hr @ 15.50 = 186 <br /> water source, water rights and S.D. 8 hr @ 14.50 = 116 <br /> wa ter qua 1 i ty Exp. 158 $2,500.00 <br />d. Prepare plan of development P .E. 26 hr @ 25.50 = 663 <br /> E.T. 4 hr @ 15.50 = 62 <br /> S.D. 2 hr @ 14.50 = 29 <br /> Exp. 46 $ 800.00 <br />e. Prepare cost estimate, project P .E. 24 hr @ 25.50 = 612 <br /> evaluation and financial E. T. 8 hr @ 15.50 = 124 <br /> analysis Exp. 64 $ 800.00 <br />f. Review meetings with Town P .E. 16 hr @ 25.50 = 408 <br /> and State officials regarding E.T. 4 hr @ 15.50 = 62 <br /> Report Exp. 30 $ 500.00 <br />g. Preparation of Report including P .E. 40 hr @ 25.50 = 1,020 <br /> writing, review, typing, print- E. T. 20 hr @ 15.50 = 310 <br /> ing, drafting and binding. S.D. 12 hr @ 14.50 = 174 <br /> P.M. 8 hr @ 11.50 = 92 <br /> Exp. 404 $2,000.00 <br /> $7,850.00 <br /> <br />NOTE: ABR. <br />P.E:'" <br />E. T. <br />S.D. <br />P.M. <br />Exp. <br /> <br />DESCRIPTION <br />Project Engineer <br />Engineering Technician <br />Senior Draftsman. <br />Print Man <br />Expenses (printing, misc.) <br /> <br />ESTIMATING RATE <br />$25.50 <br />15.50 <br />14.50 <br />11.50 <br />as shown <br />