Laserfiche WebLink
<br />'. <br /> <br />'i <br /> <br />EXHIBIT A <br /> <br />RE: Feasibility Report for Town of Hudson <br />Job No. 1051-1-1 <br /> <br />COST ESTIMATE FOR PREPARATION OF REPORT <br /> <br /> GENERAL DESCRIPTION OF WORK ITEM ESTIMATED AMOUNT INCLUDING <br /> MANHOURS EXPENSES <br />a. Accumulate, review and prepare on the water 30 $ 750.00 <br /> system and town for items noted for prefacing <br /> material, general information, etc. <br />b. Review and evaluate existing water system 20 500.00 <br />c. Review and evaluate existing and proposed 100 2,500.00 <br /> water requirements, water source, water <br /> rights, and water quality <br />d. Prepare plan of development 32 800.00 <br />e. Prepare cost estimate, project evaluation 32 800.00 <br /> and financial analysis <br />f. Review meetings with Town and State officials 20 500.00 <br /> regarding report <br />g. Preparation of Report including writing, 80 2,000.00 <br /> review, typing, printing, drafting and <br /> binding. <br /> TOTAL REPORT COST $7,850.00 <br />