Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Cost Estimates <br /> <br />The estimate of total cost of the Tamarack Project Phases lA, lB, lC, and Pony Express <br />Project is listed below. These costs are to cover material and O&M. South Platte Lower River <br />Group and Colorado Division of Wildlife participants and personnel will contribute labor as in- <br />kind services: <br /> <br />Item <br /> <br />Cost <br /> <br />. Drill 9 new groundwater wells at Tamarack Ranch <br />SW A. Purchase pipelines and associated pump hardware. <br />Install electricity. <br /> <br />$260,000 <br /> <br />Purchase pump hardware and pipelines, and <br />install electricity at Pony Express SW A. <br /> <br />$40,000 <br /> <br />Rental of large track backhoe for pipeline installation <br />and recharge basin construction. <br /> <br />$15,000 <br /> <br />. Rental of other earthmoving equipment to construct recharge <br />basins and wetland features. <br /> <br />$10,000 <br /> <br />Electricity payment (operational cost) for wells during the winter <br />months, for the next 2 to 3 years. <br /> <br />$100,000 <br /> <br />Contingency <br /> <br />$20.000 <br /> <br />Total <br /> <br />$445,000 <br /> <br />Attachments <br /> <br />. Figure 3: Tamarack Ranch Map Development Phases lA, IB, and IC <br />Figure 4: Pony Express Map showing Development Options <br />Figure 5: Tamarack Ranch Map of Phase IA with Artificial Stream <br /> <br />D:\WPS 1\Proj-New\TamarackScopI:Servic;es698 <br /> <br />Scope of services <br />The Tamarack Project <br />John Van Sciver, June 26, 1998 <br /> <br />Page 2 <br />