My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00354
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00354
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:10:52 AM
Creation date
10/5/2006 11:51:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153754
Contractor Name
Southeastern Colorado Water Conservancy District
Contract Type
Grant
Water District
0
County
Lake
Chaffee
Fremont
Pueblo
El Paso
Bill Number
SB 99-173, SB 96-170
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />. <br /> <br />. <br /> <br />Draft Water and Storage Needs Assessment <br />SECWCD/Assessment Enterprise <br />ii September 23, 1998 <br /> <br />3. For the high growth scenario (159,000 af of additional water demand), the total <br />additional water supply need is estimated to be 68,000 af, as shown in the table below, <br />primarily in Colorado Springs, the other Fountain Valley entities, and several towns west <br />of Pueblo. The Colorado SpringslFV A demands represent 97 percent of this potential <br />water supply need. The supply/demand comparisons have assumed that the Fry-Ark <br />Project yield is 80,400 af per year. Historical yield has been closer to 60,000 af per year. <br />As municipal demand increases, municipal entities will begin using greater amounts of <br />Fry-Ark Project water. Under the forecast, municipal entities will begin to use their Fry- <br />Ark supplies more heavily, approaching their 51 percent allocation by the year 2020. <br />This will impact current uses of Project water by agricultural entities for supplemental <br />irrigation and replacement supplies for well depletions, <br /> <br /> <br />'..,.."..."......."'..'...'.... Fo~ecast, Deficit..(ACrl!~Fl!et).'Hlg~"'F()recas~.'.i.i..".,.. .', ' <br />200011;\2010 < '<202() <i.2030\2040 <br /> <br />Entities West of Pueblo 828 0 0 422 2,116 <br />Pueblo West 0 0 0 0 0 <br />Pueblo 0 0 0 0 0 <br />Fountain Valley 267 1,839 9,478 35,265 65,787 <br />Entities East of Pueblo 356 0 0 0 0 <br />Total (High): 1.451 1,839 9.478 35,687 67,903 <br /> <br />(1) Apparent needs in year 2000 based on reported water supplies. Deficits assumed to be met by Fry-Ark <br />Project water by year 2010. <br /> <br />4, Most of the municipal water supply entities have water rights to meet their 2040 needs, <br />However, storage capacity is needed to provide firm yield and to facilitate water <br />exchanges and management of imported water reuse, <br /> <br />i <br />5, Average annual agricultural water use in the District is estimated to be 825,000 af(for ' I <br />ditches and canals between Pueblo and John Martin reservoirs), Agriculture relies <br />heavily on "supplemental" sources including transmountain water, Fry-Ark water, Winter <br />Water, storage reservoirs, and ground water. (Direct flow water accounts of 86 percent <br />of agricultural use in a "wet" year, but only 65 percent in a "dry" year), <br /> <br />6. Storage needs in the District are projected to range from 75,000 to 125,000 affor the base <br />and high municipal demand forecasts, This storage need includes dedicated Project <br />storage capacity for Winter Water. If other identified storage needs of water supply <br /> <br />~ GEl Consultants, Inc. <br /> <br />97411\REPORTS\TEXT _A.WPO <br />
The URL can be used to link to this page
Your browser does not support the video tag.