My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150063 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150063 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:42 AM
Creation date
10/5/2006 11:50:53 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150063
Contractor Name
Jackson Lake Reservoir & Irrigation Company
Contract Type
Loan
Water District
1
County
Morgan
Bill Number
SB 94-29
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />irrigated with this water supply. The gross value of the irrigated crops (1998 and <br />1 999) would be approximately $1,730,000, assuming the same overall crop distribution <br />as shown in Table 3. Net profit after all farm related expenses, including depreciation, <br />for the irrigated farmland would be $390,500 (1998 data" only). Also see Table 3 for <br />the determination of the gross value for 4,650 acres of irrigated crop land. For <br />comparison, 4,650 acres in dry land would produce $415,000, which is $1,315,000 <br />less that the gross revenue derived from irrigated cropland (see Table 13). Net profit <br />after expenses for the dry land farm ground would be $27.400 (1998 data" only). <br />These values indicate an additional $53.02 in gross revenue and $14.64 in net revenue <br />per acre-foot of reservoir yield for the land under irrigation. The added productivity of <br />the land under irrigation appears to warrant the project expense of $2.33 per acre-foot. <br />Table 13 lists the dry land crops grown in Morgan County and the crop income for the <br />year 1998 and 1999, prorated to 17.000 and 4,650 acres. It is acknowledged that <br />Jackson Lake Reservoir water is a supplemental sUPAly, but in some years Jackson Lake <br />Reservoir water supplies will make a crop which would otherwise be totally lost, and in <br />many years shortage of water late in the irrigation season would certainly impact crop <br />yields. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The above two valuation methods indicate that ths overall, cost of the project is <br />affordable in terms of the cost per acre-foot and incremental income derived from the <br />land when irrigated. Loss of Jackson Lake Reservoir water supplies would decrease the <br />revenue from the land substantially. <br /> <br />Institutional Considerations <br /> <br />A number of institutional hurdles and permitting issues may require addressing <br />prior to start of the project construction. The identified issues are discussed below. <br /> <br />State Engineer Design Review <br />The Design Review Section of the Office of the State Engineer is required to <br />review and approve the design of the slope repair project. The review focuses on the <br />adequacy and completeness of the technical design. This review can take up to six <br /> <br />.' <br /> <br />43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.