Laserfiche WebLink
<br />II <br />I <br />I <br />I <br />I <br />II <br />I <br />!I <br />1 <br />,I <br />1 <br />1 <br />1 <br />1 <br />I, <br />1 <br />1 <br />I <br />I <br /> <br />The reservoir is subjected to sedimentation, primarily from material transported <br />through the inlet canal, but also wind-blown materials from the surrounding lands. It is <br />unlikely that significant sediment deposition has occurred from the tributary drainage <br />basin due to the limited to non-existent flood inflow historically produced from the <br />tributary basin. It appears that sedimentation has reached a rough equilibrium, with the <br />sediment transported into the reservoir during the reservoir filling being transported out <br />through the outlet during storage releases. <br /> <br />land and RiQht of Way <br /> <br />The proposed construction will occur on the dam crest, upstream slope of the <br />dam and within the reservoir bed. The dam and land required for the dam is owned by <br />the Company. Property ownership for the reservoir bed is with the CDPOR. Aggregate <br />(sand) construction materials will be obtained from the reservoir bed and construction <br />staging areas will be in the reservoir bed. No problems with property ownership/site <br />access are expected. <br /> <br />Proiect Implementation Schedule <br /> <br />The following project implementation schedule is proposed for the project design <br />and construction. <br /> <br />Prepare Design & Technical Specifications <br />December 1, 2000 through February 28, 2001 <br /> <br />Design Review by SEO & CWCB <br />March 1 through June 30, 2001 <br /> <br />Prepare Bid Package <br />April 1 through May 15, 2001 <br /> <br />Advertise to Bid <br />May 1, 2001 <br /> <br />Obtain, Review and Select Bid <br />June 1 through June 15, 2001 <br /> <br />Funding Obtained <br />July 2001 <br /> <br />37 <br />