Laserfiche WebLink
<br />, <br /> <br />. <br /> <br />. <br /> <br />Mr. Gary Kennedy, Superintendent <br />Mancos Water Conservancy District <br />December 1 9. 1 996 <br /> <br />2 <br /> <br />d. You must adhere to the CWCB Design and Construction Administration <br />Procedures. Mike Serlet will work with you on the CWCB requirements <br />concerning construction of the project. He will make a final construction <br />inspection, which will be the basis of disbursement of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Construction Fund Loan <br />from thc Colorado Water Conservation Board. <br /> <br />Sincerely, <br /> <br />W~?~ <br /> <br />William P. Stanton, P.E. <br />Chief, Project Planning and Construction Section <br />Colorado Water Conservation Board <br /> <br />lVS:jvs <br /> <br />Attachment: <br /> <br />\.:I,d;ll~d \kl11o Xb.nov <br /> <br />cc(w/Anachl1lCIlIJ <br />.\1- .i;!llIlL' C Shcftel, Board member eWeB <br /> <br />cc(w/o AllachmclIh) <br />('\\'('1\ :-\"([I(\n B Slaff <br />1111,1.11\01'" -\(iO <br /> <br />C:\WP5I"J()]!, ,h\'.\\%]lr <br /> <br />-i-i--- <br />