Laserfiche WebLink
<br />" <br /> <br />Based on the summary of costs illustrated above, the Town of Monument has a current total <br />project cost of$4,323,755, The Town's funding sources for the project are summarized as follows: <br /> <br />El Paso County <br />Feasibility Grant CWCB <br />, Town General Water Fund <br />Fishing is Fun Grant <br />Prebbles Habitat Credit <br />Palmer Lake Sanitation District <br />CWCB Existing Loan <br />CWCB Prebbles Mouse Grant <br /> <br />= $1,273,950 <br />= $5,000 <br />= $100,000 <br />= $200,000 <br />= $103,250 <br />= $4,407 <br />= $2,081,000 <br />= $194.428 (Contingent upon Board Approval) <br /> <br />Total available funds: <br /> <br />= $3,962,035 <br /> <br />Based on the total project cost of$4,323,755, minus the available funding of $3,962,035, the <br />Town of Monument is experiencing a funding shortfall of $361,720, To address this funding <br />shortfall the Town of Monument is requesting an additional loan of $362,000 from the Colorado <br />Water Conservation Board, for a total amended loan amount of $2,443,000 at 5.5% for 30-years, <br /> <br />DISCUSSION <br /> <br />Paragraph (2) of Section 1 of HB 00-1419 allows that loans made by the Colorado Water <br />Conservation Board may be increased or decreased as may be justified by "reasons of ordinary <br />fluctuations in construction costs as indicated by the engineering cost indices applicable to the types <br />of construction required for each project or as may be justified by reason of changes in the plans for <br />a project due to differing or unforeseen site conditions, errors, or omissions in the plans and <br />specifications, changes instituted by regulatory agencies, or changes in material quantities beyond <br />contract limits ", Unforeseen site conditions, design modifications, and additional work not <br />programmed in the original cost estimate of the project, has required work that increases the total <br />estimated cost of the project and therefore justifies the Town of Monument's requested $362,000 <br />increased loan request, <br /> <br />The new loan amount for the Town of Monument will be $2,443,000 (which is less then <br />75% of the total construction cost) at aD. interest rate of 5.50 % for 30-years, The cash flow <br />analysis provided, based on the Town's new annual payment of $168,092, indicates sufficient <br />annual revenues in each year of CWCB loan repayment, which is from 2003 through 2033, With <br />the amended loan amount all financial indicators still fall in the strong category with the exception <br />of the debt per tap, which is in the average category, <br /> <br />The Town of Monument has a separate "Water Enterprise", which receives revenues from <br />its water customers, The CWCB will take collateral interest in this stream of revenues, and will be <br />in a parity position with all existing debts of the enterprise.. <br /> <br />Based on staffs review of the original feasibility cost projections, the supporting <br />documentation provided by the Town of Monument of additional cost occurred to-date, inspection <br />of the site, and overall financial strength of the Town, staff finds the requested loan increase of <br />$362,000 to be economically, financially, and technically sound, <br /> <br />5 <br />