My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150062 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150062 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:04:48 AM
Creation date
10/5/2006 11:50:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150062
Contractor Name
Monument, Town of
Contract Type
Loan
Water District
10
County
El Paso
Bill Number
SB 01-157
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br />Department ofN atura! Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866--3441 <br />FAX: (303) 866-4474 ' (Revised) <br /> <br />i1 <br /> <br />Memorandum <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E, Walcher <br />Executive Director <br />Dan McAuliffe <br />CWCB Director <br />(Acting) <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />FROM: Tim Feehan, P ,E" Project Manager <br />Mike Serlet, P ,E" Chief, Water Supply Planning and Finance Section <br /> <br />DATE: July 12, 2002 <br /> <br />SUBJECT: Agenda Item No. 17c, July 23-24, 2002, Board Meeting <br />Water Supply, Planning and Finance - Changes to Existing Loans <br />Town of Monument <br />Monument Dam Rehabilitation Project <br /> <br />INTRODUCTION <br /> <br />The Town of Monument, Colorado, is requesting an increase of $362,000 to the Town's <br />2001 authorization of$2,081,000 for the Monument Dam Rehabilitation Project. The requested <br />loan increase is due to cost overruns incurred during construction and additional work that has <br />been incorporated into the overall project. <br /> <br />BACKGROUND <br /> <br />At the January 2001 board meeting, the Colorado Water Conservation Board approved a <br />loan to the Town of Monument in the amount of $2,081,000, from the Severance Tax Trust Fund <br />Perpetual Base Account. The $2,081,000 authorization was for improvements to the dam to <br />address safety deficiencies identified by the State Engineer's Office, who indicated the dam to be in <br />very poor condition and in need of immediate repair, The improvements to the reservoir where <br />designed by Boyle Engineering, from Lakewood, Colorado, and are currently being constructed by <br />AS! ReC, Inc" from Buena Vista, Colorado, <br /> <br />An intergovernmental agreement (IGA) between EI Paso County and the Town of <br />Monument was finalized on January 5,2001, relieving the County of all responsibility of the dam <br />upon completion of the repair work and upon financial contribution towards the repair by the <br />County, Of the $3,081,000 estimated project cost, EI Paso County will provide at least $1,000,000 <br />under the terms of the IGA between the Town and County, Therefore, the Town of Monument's <br />existing loan amount with the Colorado Water Conservation Board for the dam repair is $2,081,000, <br />at an interest rate of5.5% for 30-year, <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.