My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150062 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150062 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:04:48 AM
Creation date
10/5/2006 11:50:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150062
Contractor Name
Monument, Town of
Contract Type
Loan
Water District
10
County
El Paso
Bill Number
SB 01-157
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br />I <br />j <br /> <br />, , <br />\ <br /> <br />-.1 <br /> <br />.-1 <br /> <br />, <br /> <br />Executive Summary <br /> <br />This study examines the feasibility of non-structural and structural alternatives to <br />rehabilitate the area comprising of Monument Lake Dam and Reservoir; and demonstrates the <br />technical, financial, environmental, and institutional feasibility of the alternatives, The project <br />will be funded between the Town of Monument (Town) and EI Paso County (County), The <br />Town is requesting funding through the Colorado Water Conservation Board (CWCB) for their <br />portion ofthe project, while the County will be funding their portion through County <br />appropriated funds, The study has been prepared in conformance with requirements for funding <br />of the CWCB and the dam safety regulations of the Colorado State Engineer's Office (SEO), <br /> <br />The reservoir is presently under SEO restriction; the water surface must be kept three feet <br />below the spillway crest. On May 6, 1998 the SEO recommended a zero-storage restriction due <br />to dam safety deficiencies, This recommendation has not yet been enforced but the SEO could <br />do so at any time, These dam safety deficiencies include: <br /> <br />I, Deteriorated outlet works; <br />2, Absence of outlet energy dissipating structure; <br />3, Unacceptable tree growth on dam embankment; <br />4, Inadequate protection from wave action on upstream face of dam; and <br />5, Spillway capacity inadequacy, <br /> <br />Alternatives were developed to correct these deficiencies, which included rehabilitating <br />the dam embankment, outlet works, and spillway, The recommended alternatives for the project <br />include the following: <br /> <br />I. Rehabilitating the eJ;ll.bankment by excavating the top 10 feet of the crest and <br />downstream face of the dam and then constructing chimney and blanket drains <br />covered with embankment fill up the existing dam crest elevation, <br /> <br />Monument Lake Dam Feasibility Study <br /> <br />, <br />III <br /> <br />130'rlLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.