My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150062 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150062 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:04:48 AM
Creation date
10/5/2006 11:50:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150062
Contractor Name
Monument, Town of
Contract Type
Loan
Water District
10
County
El Paso
Bill Number
SB 01-157
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Acknowledgments <br /> <br />Boyle Engineering Corporation would like to thank the Town of Monument for their <br />valuable assistance during the preparation of this report, Special thanks are offered to Messrs, <br />Rick Sonnenburg, Leon Tenney, and Ms, Betty Konarski, Town of Monument; Mr. Garrett <br />Jackson, State Engineer's Office (SEa); Mr. Robert Krassa, Krassa, Madsen & Miller, LLC; Mr, <br />Roger Sams, GMS Consulting Engineers; and Mr. Bill Green, Colorado Water Conservation <br />Board (CWCB) for their time and efforts on this project. <br /> <br />The following lists Boyle's team members for the project: <br /> <br />Mr, Ed A, Toms, P,E, <br /> <br />Project Manager/ <br />Principal Designer <br /> <br />Mr. Blaine Dwyer, P,E. <br /> <br />Principal-in-Charge <br /> <br />Mr. David Blanchette, P,E, <br /> <br />Structural Engineer <br /> <br />Mr, Richard Pearce, E,LT, <br /> <br />Civil/Hydraulic Engineer <br /> <br />Mr, Kit Choi, PhD" P,E. <br /> <br />BasePoint Design Corporation <br />Geotechnical Services <br /> <br />, <br />" <br /> <br />Mr. John Lambert, PLS <br /> <br />Sellards & Grigg, Inc, <br />Surveying Services <br /> <br />Monument Lake Dam Feasibility Study <br /> <br />11 <br /> <br />SCJYLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.