Laserfiche WebLink
<br />Acknowledgments <br /> <br />Boyle Engineering Corporation would like to thank the Town of Monument for their <br />valuable assistance during the preparation of this report, Special thanks are offered to Messrs, <br />Rick Sonnenburg, Leon Tenney, and Ms, Betty Konarski, Town of Monument; Mr. Garrett <br />Jackson, State Engineer's Office (SEa); Mr. Robert Krassa, Krassa, Madsen & Miller, LLC; Mr, <br />Roger Sams, GMS Consulting Engineers; and Mr. Bill Green, Colorado Water Conservation <br />Board (CWCB) for their time and efforts on this project. <br /> <br />The following lists Boyle's team members for the project: <br /> <br />Mr, Ed A, Toms, P,E, <br /> <br />Project Manager/ <br />Principal Designer <br /> <br />Mr. Blaine Dwyer, P,E. <br /> <br />Principal-in-Charge <br /> <br />Mr. David Blanchette, P,E, <br /> <br />Structural Engineer <br /> <br />Mr, Richard Pearce, E,LT, <br /> <br />Civil/Hydraulic Engineer <br /> <br />Mr, Kit Choi, PhD" P,E. <br /> <br />BasePoint Design Corporation <br />Geotechnical Services <br /> <br />, <br />" <br /> <br />Mr. John Lambert, PLS <br /> <br />Sellards & Grigg, Inc, <br />Surveying Services <br /> <br />Monument Lake Dam Feasibility Study <br /> <br />11 <br /> <br />SCJYLE <br />