Laserfiche WebLink
<br />I <br />I <br />I ~ ~ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />D. Spillway <br />General. Adequate design spillway capacity, unrestricted flow, and con- <br /> <br />trolled discharge are obviously key considerations in overall project safety. <br /> <br />Recommendations are limited to the geotechnical aspects of spillway design <br /> <br />and operation as hydrologic and hydraulic studies are beyond the scope of <br /> <br />the review. It is understood that the inflow design flood has been reviewed <br /> <br />by others. <br />Approach Channel. Excavated side slopes up to 50 feet high are shown <br /> <br />on the drawings at 1.5:1. Considering the effects of the high water table <br /> <br />and possible toe erosion during discharge, flatter slopes are recommended. <br /> <br />Slopes of 3:1 or 2:1 with a bench at mid-height are recommended to insure <br /> <br />against a slump or extensive ravelling which could restrict spillway flow. <br /> <br />Discharge Channel. Although no data were available on discharge fre- <br /> <br />quency or velocities, the 1.5:1 riprapped side slopes could not be expected <br /> <br />to withstand prolonged high velocities or turbulence. Assuming, however, <br /> <br />that the design is adequate for normal discharges and frequency of use, no <br /> <br />modifications are recommended. If not adequate for normal flows, either <br /> <br />grouting of the riprap or the use of large size armor stone should be con- <br /> <br />sidered. These comments are based on the concept that it is probably im- <br /> <br />practical to design against all damage which could result from the maximum <br /> <br />probable flood. The essential point is that such damage would be limited <br /> <br />to the spillway discharge area and would not endanger the dam or the abut- <br /> <br />ments. Inspection of the Coal Creek streambed,indicates that while extremely <br /> <br />high flows would cause substantial erosion, the channel would contain the <br /> <br />discharge until it was safely past the damsite. <br /> <br />E. 'Shoreline. <br /> <br />'Criteria. In evaluating shoreline stability it was assumed that the <br /> <br />primary concern would be a massive slide which could cause substantial damage. <br /> <br />This damag~ could range from loss of a portion of the relocated road to <br />