Laserfiche WebLink
' <br />, <br />� <br />' Item # <br />' <br />, <br />, <br />' <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />' <br />, <br />, <br />, <br />' <br />' <br />' <br />, <br />' <br />, <br />' <br />TABLE 1 <br />ESTIMATED CONSTRUCTION COST <br />Estimated <br />Item <br />Turkey Creek Diversion <br />Lost Canyon Diversion <br />Rail Road Siphon <br />Lost Canyon Ditch Lining <br />Lost Canyon Ditch Lining <br />Summit to Puett Conveyance <br />Wallace Drop <br />Walker Drop <br />Joe Moore Measuring Flume <br />Turkey Creek Measuring Flume <br />South Main Ditch Pipeline <br />Rail Road Siphon Safety <br />Summit Dam Outlet Repair <br />Mlsc. Repairs/Improvements <br />Capacity Le�gth (ft) Type <br />60 cfs <br />129 cfs <br />129 cfs <br />129 cfs <br />129 cfs <br />50 cfs <br />19.1 cfs <br />14.1 cfs <br />60 cfs <br />60 cfs <br />3.5 cfs <br />Repair <br />Repair <br />200 Replace or Llne <br />400 Arch CMP <br />400 Arch CMP <br />3800 Improvement <br />2200 Replacement <br />1250 Replacement <br />Install Flume <br />Install Flume <br />6000 Install Pipe <br />Install <br />Line & Replace <br />Subtotal <br />Contingencies (15%) <br />Engr, Admin, Etc. (8%) <br />TOTAL ESTIMATED CONSTRUCTION COST <br />7 <br />Construction <br />Cost Year <br />$8,000 <br />$15,000 <br />$123,000 <br />$50,000 <br />$50,000 <br />$72,000 <br />$43,000 <br />$24,000 <br />$2,000 <br />$2,000 <br />$48,000 <br />$2,000 <br />$55,000 <br />$150,000 <br />$644,000 <br />$97,000 <br />$59,000 <br />$800,000 <br />1997 <br />1997 <br />2002 <br />2001 <br />2000 <br />2003 <br />1999 <br />1998 <br />1998 <br />1998 <br />2002 <br />1997 <br />1997 <br />various <br />