My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00337
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00337
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:19 AM
Creation date
10/5/2006 11:50:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153032
Contractor Name
Hotchkiss, Town of
Contract Type
Grant
Water District
0
County
Delta
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br /> <br />McDERMITH AND SCHUSTER <br /> <br />"CONSULTING ENGINEERS AND LAND SURVEYORS" <br />P O. Box 58 . Cedaredge, Colorado 81413 . (303) 856-3127 <br /> <br />February 23, 1981 <br /> <br />Nick Ioanni,des <br />Colorado Water Conservation Board <br />823 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br /> <br />Re: Town of Hotchkiss, Colorado <br /> <br />Dear Nick: <br /> <br />Transmitted herewith please find a Supplement to the "Feasibility and <br />Master Plan Report" of 1976 as prepared by Wright-McLaughlin Engineers. <br />This Supplement is brief in that it refers to the Water Supply Master <br />Plan Report throughout the Supplement. The estimated annual costs for <br />the complete construction of the two projects recommended in the Supple- <br />ment will require $5,250.00, an annual payment of $3,210.00 for replace- <br />ment of approximately 4,000 feet of treated water transmission li,ne and <br />$2,040.00 for the installati,on of a hydroelectric plant,. The total <br />construction costs are estimated to be $91,250.00, $55,500.00 for' the <br />replacement of a portion of the treated water transmission line and <br />$35,750.00 for the installation of the hydroelectric generating uni.t. <br /> <br />The 1981 budget for the Town of Hotchkiss shows $25,000.00 bei,ng placed <br />in a reserve fund, the $5,250.00 required for the annual payments of the <br />recommended projects would be taken from the reserve fund. The Farmers <br />Home Administration requires that the Town of Hotchkiss have a reserve <br />fund of at least one annual interest and pri,ncip1e payment of $36,000.00, <br />however; the Farmers Home Administration allows this $36,000.00 reserve <br />fund to be bui,lt up over a period of ten years. <br /> <br />Please review the contents of this Supplement and advise me of your thoughts <br />and the avai1abili,ty of funding from the Colorado Water Conservation Board's <br />Constructi,on Fund. We look forward to an affirmative review of our request <br />for funds and should you have any further questions or comments concerning <br />the contents of this supplement please do not hesitate to contact us. <br /> <br />Truly yours, <br /> <br />/~/~ <br /> <br />Raymond J. Schuster, CCE <br />Project Engineer <br /> <br />RJS/s1h <br /> <br />r <br /> <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.