Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />B. Provide an adequate 1o'ater supply for Dillon and <br /> <br />Dillon Valley in a manner that protects the <br /> <br />fishery on straight Creek and provides <br /> <br />protection against hazardous spills and other <br /> <br />quality problems related to the Straight Creek <br /> <br />drainage. <br /> <br />possible means to achieve this <br /> <br />objective are: <br /> <br />1. Additional storage reservoir. <br /> <br />2. Use of Old Dillon Reservoir. <br /> <br />3. Alternative points or methods of diverting <br /> <br />the municipal .;ater. <br /> <br />C. Provide for municipal, irrigation and snow- <br /> <br />Based upon D. <br />the resul ts <br />of the analyses <br />performed for <br />objectives A, B, <br />and C, <br /> <br />making uses on the Blue River below Dillon <br /> <br />Reservoir while maintaining flow rates in the <br />Dillon Dam down to <br />Blue River from v'Straight Creek at no less than <br /> <br />50 cfs, and from Straight Creek to the joint <br /> <br />Silverthorne-Dillon sewage plant at 52 cis, <br />an initial proposal for a <br />develop ~~renens~ mitigation plan that can <br /> <br />be used by all potential Green Mounta:i,n <br /> <br />Reservoir contractees within Summit County above <br />Silverthorne to satisfy mitigation requirements <br /> <br />that mey be imposed by federal agencies as a <br /> <br />part of the Green Mountain Reservoir Water <br /> <br />Marketing NEPA compliance process. <br /> <br />II. DRAFT SCOPE OF WORK FOR OBJECTIVES A AND C <br /> <br />A. Blue River Above And Below Dillon Reservoir. <br /> <br />1. Identify present and future water rights <br /> <br />and water use demands. <br />