My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150080 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150080 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2010 11:44:31 AM
Creation date
10/5/2006 11:50:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150080
Contractor Name
Larimer County, Board of County Commissioners
Contract Type
Grant
Water District
3
County
Larimer
Bill Number
SB01-157
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />. ,...l . <br /> <br />. <br /> <br />. <br /> <br />performed by the Project Consultant. Any Project-related questions or problems should be <br />directed to Rex at (970) 498-5721. The Study Manager serves as point of contact for the <br />owners and will be available for meetings and for coordination with the Consultant. The <br />Consultant will be responsible for providing a project manager and/or project engineer to <br />serve as the point of contact for coordination with the Study Manager. The Study Manager <br />will also coordinate with the City (Mr. Bob Smith, 970-224-6021) and the CWCB (Mr. Tom <br />Browning, 303-866-3441) to assure that all project sponsors are fully updated on the Study <br />progress. <br /> <br />H. Completion of Work <br /> <br />The Consultant shall complete all tasks as assigned in this Scope of Work within 90 days of the <br />Notice to Proceed. Notice to Proceed and Study initiation shall be implied when a Study <br />contract has been fully signed by all parties to the contract. The format of the final manual <br />shall be a bound 8.5" by 11" report in a comb binder with foldout pages or map pockets as <br />necessary. Study contract will not ierminate until such time that the CWCB has accepted and <br />approved the Study report for consideration of a project loan from the CWCB construction fund. <br /> <br />Project completion shall not extend beyond December 31, 2002 under any circumstance. <br /> <br />Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.