Laserfiche WebLink
<br />_. <br /> <br />. <br /> <br />. <br /> <br />10. Economic information for Selected alternative <br />a. Detailed cost estimate for Selected Alternative <br />b. Detailed cost estimate for needed land purchases <br />c. Construction feasibility and implementation schedule <br />d. Description of project benefits and benefit-cost analysis with final B/C ratio <br />11. Financial feasibility of project construction for CWCB loan repayment <br />a. Description of the total financing package <br />b. Total Financial Table <br />c. Loan amount, census tracts, median income, and terms <br />d. Creation of Stormwater Utility <br />i. Enacting Legislation and Authority <br />ii. Customer Base and Service Area <br />iii. Utility Rates <br />iv. Collection Mechanism <br />v. Projected Revenue <br />e. Cash flow and existing stormwater utility obligations <br />f. Ability to pay back loan (based on information in a-e) <br />g. Cash reserves or method of collateral <br />12. Environmental assessment for Selected alternative <br />a. Status of Environmental Assessment and permitting activities <br />b. Wetlands <br />c. Aesthetics <br />d. Historic places <br />e. Human impacts <br />f. Wildlife impacts <br />g. Endangered species surveys <br />h. Others <br />13. Define Permitting procedures and time lines for Selected alternative <br />a. City and County Floodplain Use Permits <br />b. Corps of Engineers 404 permit <br />c. State Historic Preservation Office (SHPO clearance) <br />d. Division of Wildlife/U.S. Fish and Wildlife <br />e. State Engineers Review of the selected alternative <br />f. Others <br /> <br />Page 3 of 5 <br />