My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00330
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:18 AM
Creation date
10/5/2006 11:50:05 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153510
Contractor Name
Ute Mountain Ute Tribe
Water District
0
County
Montezuma
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />terms and schedu1 e of payment for the water supply. <br />amount is used by the Tribe, the annual charge will be <br /> <br />Once the full 1,000 af <br />about $100 per ~f. <br /> <br />The above agreements are associated with the delivery of an untreated ral'/ <br />water supply. The Tribe is presently negoti,~ting an agreement with the City <br />of Cortez for the treatment of the water to be conveyed in the Towaoc <br />pipeline. One of the provisions now included in the draft agreement allows <br />either party to terminate the agreement upon proper notification, with a set <br />time allowed before water treatment is discontinued. Should this prQvision be <br />exercised by either party, the Tribe would need to provide their own treatment <br />facil ity or make arrangements for another entity to treat the water. The <br />design considerations required for the pipeline to convey either treated water <br />from below the Cortez water treatment p1 ant or raw water di rect1y from the <br />Cortez pipeline will be addressed in this report. <br /> <br />1.6 Feasibility Report Content <br /> <br />The subsequent secti ons of thi s report document the techni ca1 analyses and <br />evaluations made relating to the design discharge, pipe size, pipe type, <br />pipeline alignment, and estimated costs of the pipeline. In addition, the <br />results of evaluations of the Towaoc municipal water distribution system are <br />presented, accompanied by cost estimates for various improvements, and <br />recommendati ons for pri oriti es for impl ementi ng the improvements. A schedul e <br />is presented that outlines the primary activities and associated time <br />requirements for implementing the entire project. <br /> <br />Pertinent data and support information are included in the Appendix. <br /> <br />1-7 <br /> <br />1040c <br />
The URL can be used to link to this page
Your browser does not support the video tag.