My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00329
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00329
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:03:50 AM
Creation date
10/5/2006 11:50:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153370
Contractor Name
Dames and Moore
Contract Type
Loan
Water District
0
County
Weld
Bill Number
SB
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />~, <br /> <br />'", <br /> <br />.~ <br /> <br />. <br /> <br />. <br /> <br />e. A site reconnaissance to field check the results of the <br />air-photo analysis. aaulage routes from borrow areas <br />to the dam site will also be checked during the site <br />reconnaissance. <br /> <br />f. Reevaluation of existing geotechnical data such as soil <br />%ample descriptions, field and laboratory test results <br />and geophysical logs to assess conditions of the <br />foundation and abutment soil and rock. <br /> <br />Task 5 - Preliminary Dam and Spillway Design <br /> <br />The general approach for the dam and spillway design <br />studies will be to investigate alternative earth embankment <br />types, sections, spillways and alignments for a range of <br />alternative heights. Preliminary assumptions as to topographic <br />limitations and reservoir storage requirements will be made in <br />consultation with the CWCB to allow the first alternative design <br />studies to be made. The design studies will then progress toward <br />their final configuration as the results of the reservoir studies <br />(TaSk 6) are integrated into the dam design analysis. <br /> <br />The spillway design studies will be of particular <br />importance because of the size of the design flood, the <br />opportunity for trade-offs between reservoir surcharge storage <br />and spillway size and potential problems in the spillway <br />foundation. <br /> <br />The work for this task will include the following: <br /> <br />a. Dam alignment evaluations will concentrate primarily on <br />the previously studied location approximately 2.5 miles <br />upstream of the Rive~side Reservoir ("Weld County <br />Site") with' three possible axis alignments. This <br />location will be consioered fixed for reservoir sizes <br />of approximately 1,000,000 acre-feet. Should optimum <br />reservoir sizing indic~te a smaller reservoir, a brief <br />evaluation of alternative sites will be conducted. <br />Axis alignment will be selected based on economic and <br />engineering considerations of material availability and <br />foundation conditions ~s defined by Task 4. The final <br />decision on the dam location and axis alignment will be <br />made in consultation w:lth and subject to CWCB <br />approval. <br /> <br />b. The primary emphasis ot the preliminary design work is <br />identification of major facility components and <br />quantities in meeting current design standards and the <br />requirements of the Colorado State Engineer's office. <br />The level of accuracy ~ill be controlled by available <br />topographic information, the available materials and <br />foundations, and other readily available information. <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.