My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153379 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153379 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 11:45:21 AM
Creation date
10/5/2006 11:49:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153379
Contractor Name
Brook Forest Water District
Contract Type
Loan
Water District
9
County
Jefferson
Bill Number
SB 80-67
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />II <br />I <br />I <br /> <br />The principal spillway would be located in the ri"ht or southern abut- <br /> <br />ment. <br /> <br />The principal spillway (as well as the reservoi r) was designed to <br /> <br />I <br /> <br />accommodate an inflow design flood with a peak flow of 485,000 cfs and a <br /> <br /> <br />10-day flood volume of 1,918,000 ac-ft. A primary outlet structure consisting <br /> <br /> <br />of a 14 ft diameter pipe would be located between the principal spillway and <br /> <br />the present stream channel. <br /> <br />Just south of the primary outlet structure, an <br /> <br />I <br /> <br />irrigation outlet structure consisting of a 9 ft diameter pipe would be <br /> <br /> <br />provided to deliver water to the Bijou Canal. In the left abutment, an <br /> <br /> <br />irrigation outlet structure consisting of a 10 ft diameter pipe followed by a <br /> <br /> <br />4.5 mile canal to deliver water to the Riverside Canal. <br /> <br />I <br />I <br />I <br /> <br />A summary of principal project features include: <br />Dam <br />Location: 22 river miles downstream from Greeley <br /> <br />With Flood Control <br /> <br />Without Flood Control <br /> <br />I <br /> <br />Height: <br />Embankment Length: <br />Embankment Volume: <br />Principal Spillway: <br /> <br />136.5 ft <br /> <br />130.5 ft <br />5.4 miles <br />17,470,000 cu yd <br /> <br />I <br /> <br />5.6 miles <br />19,700,000 cu yd <br /> <br />300 ft wide ungated concrete ogee section, chute and <br />stilling basin <br /> <br />I <br /> <br />Reservoir <br /> <br />I <br /> <br />Top of Surcharge Storage Zone: <br />Top of Active Storage Zone: <br />Top of Inactive Storage Zone: <br />Surface Area Top of Active <br />Storage Zone: <br /> <br />With Flood Control Without Flood Control <br />1,491,500 ac-ft 1,268,000 ac-ft <br />483,000 ac-ft 483,000 ac-ft <br />26,000 ac-ft 26,000 ac-ft <br /> <br />I <br /> <br />I <br /> <br />16,500 acres <br /> <br />16,500 acres <br /> <br />I <br /> <br />Outlet Works <br /> <br />Primary Outlet - 14 ft diameter steel lined concrete conduit with inlet <br />tower <br /> <br />I <br /> <br />Bijou Canal Outlet - 9 ft diameter concrete conduit with inlet tower <br /> <br /> <br />Riverside Canal Outlet - 10 ft diameter concrete conduit with inlet tower <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />v <br />
The URL can be used to link to this page
Your browser does not support the video tag.