Laserfiche WebLink
<br />D~lui led hoposu] ';.,:eusibi Ii ty. Report <br />Hotchkiss, COlorudo"",uter System <br /> <br />{e <br /> <br />Puge 3 <br /> <br />9. Environmentill I,"PilCt Study: This section would include the effects of the <br />project on the overal I envi ronment. I t would include, but not be limited <br />to, the effect on humiln health, aquatic life, and the sub-surface demilin. <br />The study wi II cover the envi ronmental impact in a rather broad manner, <br />and attempt to include al I relevant considerations. The 'patial effects <br />on neighboring areas, particularlY with regard to downstream water users, <br />wi I I be noted. <br /> <br />SCHEDULE <br /> <br />Wright-/1cLaughl in Engineers is prepared to commence ,lOrk immediately upon <br />receipt of authorization to do so and to have the report completed in 60 days.' <br /> <br />11ETHOO OF PAYMENT <br /> <br />The report will be prepared for ~ lump sum fee of $5,500,00. This will <br />incl ude submi ttal of the rep"rt in up to 25 copies. The breakdown of the <br />estimated man-hour and cost input is given below: <br /> <br />ESTIMATED MANHOUR-COST SCHEDULE <br /> <br />We' , Item, Est. Principal & <br />(Fro Scope) Sr. Enqr. Days <br /> 1.2 <br /> 2 I.I! <br /> 3 1.8 <br /> 4 3.0 <br /> 5 3.0 <br /> 6 2.4 <br /> 7 2.4 <br /> e 2.1, <br /> ) I, S <br />Totols !TIT <br /> <br />Est. 0 f f i ce & <br />Field Enqr. Days <br /> <br />1.2 <br /> <br />1.8 <br /> <br />1.8 <br /> <br />3.0 <br /> <br />3.0 <br /> <br />2.4 <br /> <br />2.4 <br /> <br />2.4 <br /> <br />I. d <br />19.0 <br /> <br />Estimated Cost <br />incl. Clerical <br /> <br />$ 330 <br /> <br />520 <br /> <br />520 <br /> <br /><JOO <br /> <br />800 <br /> <br />670 <br /> <br />670 <br /> <br />670 <br /> <br />520 <br />$5,500 <br /> <br />Sub'11i l ted by <br /> <br />i;R\f:cj <br /> <br />\fRIGHT-McLAUGHLIN ENGINEE J <br /> <br />81' IL@w.: <br /> <br />Kennelh R, <br /> <br />