Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Design item (continued) <br /> <br />(7) ironstone Canal <br /> <br />(i) Wood Flume south <br />of Olathe <br /> <br />Replace with 700 feet concrete <br />section <br /> <br />(8) East Canal <br /> <br />(i) Flume through Olathe <br /> <br />Replace with 4,400 feet pipe <br />conduit <br /> <br />(9) Purchase of equipment and materials to be utilized in the rehabili- <br />tation and subsequent operation' and maintenance of the Uncompahgre <br />Project <br /> <br />(10) Miscellaneous rehabilitation of unscheduled Project facilities as <br />agreed upon by the Contractor and the Contracting Officer. <br /> <br />(b) The work program shall be performed or managed by the Contractor <br /> <br />in a manner satisfactory to the Contracting Officer. <br /> <br />(c) The Contracting Officer shall determine and notify the <br /> <br />Contractor in writing'when the work program is completed within the meaning <br /> <br />of this contract or after the total expenditures have been made to the limit <br /> <br />stipulated in Article 4. <br /> <br />SCHEDULING' OF WORK <br /> <br />3. (a) After execution of this contract, the Contractor shall submit <br /> <br />to the Contracting Officer a master work schedule and detailed work schedules <br /> <br />quarterly pursuant to the following: - <br /> <br />(1) The master work schedule will show by fiscal years the <br /> <br />entire work to be performed or caused to be performed pursuant to this con- <br /> <br />tract and the total estimated cost thereof. Such master work schedule will <br /> <br />be updated and submitted to the Contracting Officer each fiscal year until <br /> <br />completion of the rehabilitation and betterment work is accomplished pursuant <br /> <br />to subdivision (c) of Article 2. <br /> <br />(2) The detailed work schedule will show, by months, the work <br /> <br />to be performed and funds required during each quarter. Submittal of the <br /> <br />5 Articles 2 and 3 <br />