My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00324
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:23 AM
Creation date
10/5/2006 11:49:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153522
Contractor Name
Uncompahgre Valley Water Users Association
Contract Type
Loan
Water District
41
County
Delta
Bill Number
SB 88-30
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />~ <br /> <br />. <br /> <br />(g) "agricultural water" shall mean water "aed for commercial <br /> <br />production-of agricultural crops, including domestic "Be incidental thereto; <br /> <br />(h) "land receiving irrigation benefits" silall mean all irrigable <br /> <br />land within the Contractor's service area whether agr~cultural water is <br /> <br />delivered to such lands or not. <br /> <br />The Contractor agrees that these definition~ are subject to modifi- <br /> <br />cation in rules and regulations lawfully adopted. <br /> <br />WORK TO BE PERFORMED <br /> <br />2. (a) The rehabilitation and betterment work &ontemplated 'by this <br /> <br />-:.. <br /> <br />contract shall consist of the following described worV program, as may <br /> <br />be scheduled and performed by the Contractor or at th~ direction of the <br /> <br />Contractor in accordance with the provisions of this r-ontract, with funds <br /> <br />advanced hereunder by the United States: <br /> <br />STRUCTURE REPLACEMENT <br /> <br />Design item <br /> <br />(1) Selig Diversion Dam <br /> <br />Replace wo&Oen sluicegate with <br />power op,erated radial gate <br /> <br />Reh'abilitar:e Diversion Dam and <br />headwork'" , divert Loutzenhizer <br />drain in the Uncompahgre River <br />upstream from Garnet Diversion <br />Dam <br /> <br />(2) Garnet Diversion Dam <br /> <br />(3) East Canal Diversion Dam <br /> <br />Extend apr(9n and wingwall and add <br />new sluic;eway and diversion <br />control "",orks <br /> <br />(4) South Canal (All stations measured in miles) <br /> <br />(i) Outlet Channel at <br />Sta. 0.0 - 0.37 <br /> <br />Replace I 6100 feet of existing <br />, . <br />concrete sect1.on <br /> <br />(ii) Concrete chute at <br />Sta. 0.37 - 0.46 <br /> <br />Replace 506.1 feet of old lining <br />(iii) Stilling basin, Sta. 0.62 Raise wall and riprap <br /> <br />(iv) Drop, Sta. 1.5 <br /> <br />Repair conc~rete <br /> <br />3 <br /> <br />Articles 1 and 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.