My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153659 Contract
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153659 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:08:16 AM
Creation date
10/5/2006 11:49:40 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153659
Contractor Name
Hydrosphere Research Consultants
Water District
0
County
Statewide
Bill Number
HB 93-1273
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Exhibit I - Scope of Services <br />Metropolitan Water Supply Investigation <br /> <br />November 17, 1993 <br />Page 22 <br /> <br />Anticipated Problems <br /> <br />It will be critical to effectively narrow and specify the most promising water supply <br />opportunities to a manageable number for study. Scheduling problems related to effectively <br />dovetailing the Project with other important ongoing water supply planning efforts may also be <br />challenging, <br /> <br />Oeliverables <br /> <br />A task memorandum would be prepared summarizing the results of the scoping efforts, <br />This memo would identify the parties that must be involved in the analysis of the identified <br />opportunities and describe the nature of their interests and expertise. It would describe the <br />systems integration options identified in the scoping process and would present any issues and <br />concerns identified by the interested parties, It would summarize the availability of existing <br />information and models including the status and scope of ongoing studies. <br /> <br />Cost <br /> <br />The initially estimated budget for this task.is $8,657. <br /> <br />Refine Study Plan <br />Purpose <br /> <br />This task will produce a more specified and directed work plan based on the results of <br />the initial scoping meetings. The work plan will identify specific data requirements and <br />sources, geographic scope, analytical requirements and tools, investigations necessary to define <br />facility needs and financial, environmental and institutional issues to be investigated, The <br />results of this task will be used to guide the remainder of the Study process, <br /> <br />Methodology and Evaluation Techniques <br /> <br />The Project Team would incorporate the results of the scoping meetings into a draft <br />Refined Study Plan. This draft would include detailed descriptions of the tasks required for <br />data collection and analysis and investigation of the water supply opportunities. The Refined <br />Study Plan would identify which data were readily available in useful form from other ongoing <br />studies and from State agencies, and which data would have to be gathefed and developed <br />through special studies, <br /> <br />The draft would be reviewed by the Study Management team and T AC, and comments <br />would be reflected in a Final Study Plan. <br /> <br />Linkages With Other Tasks <br /> <br />This task will rely upon results of the scoping process described above and will <br />specifically define other tasks necessary for completion of the MWSI project. <br /> <br />Likely Sources of Information To Be Used <br /> <br />The primary source of information for refinement of the study plan will be input from <br />TAC, the Project Management Committee and the consulting team. <br />
The URL can be used to link to this page
Your browser does not support the video tag.