Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3.0 PREVIOUS STUDIES <br /> <br />The following is a chronological list of reports from previous investigations <br />which pertain to this feasibility study: <br /> <br />o Engi neeri ng Report on Rehabi 1 i tati on of Barnes Meadow and Peterson <br />Reservoi rs, larimer County, Colorado; Ne1 son, Hal ey, Patterson, and <br />Quirk, Inc.; December, 1968. <br /> <br />o Phase I Inspection Report, National Dam Safety Program - Peterson <br />lake, larimer County, Colorado; U. S. Army Corps of Engi neers, OmaI1a <br />District; July 14, 1980. <br /> <br />o <br /> <br />Preliminary Design Report <br />Ellingson, and Morrill, Inc.; <br /> <br />Comanche and <br />r~arch, 1983. <br /> <br />Peterson <br /> <br />Dams; <br /> <br />McCal1- <br /> <br />o Drilling and grouting done on the dam in 1983 and 1985. <br /> <br />Each of these reports was reviewed to supplement the information gathered for <br />this investigation. Additional data was obtained from the working files of <br />the City of Greeley and the Office of the State Engineer. <br /> <br />-6- <br />