Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />Implementation Schedule <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br /> <br />Tarqet Completion Date <br /> <br />l. <br />2 . <br />3. <br />4. <br />6 . <br />7. <br /> <br />Inclusion in the Northern District <br />Purchase Water shares <br />Complete Final Design <br />Start Construction <br />Complete Construction <br />Project is Operational <br /> <br />3/9/96. <br />4/25/97 <br />10/31/97 <br />11/30/97 <br />5/30/98 <br />6/15/98 <br /> <br />Social, Economic, and Physical I~pacts <br /> <br />The project will have no significant social impact. <br /> <br />The project will have a positive economic impact associated with <br />assuring a supply of water for the Subdivision/s residents. <br /> <br />The project will have no significant physical impacts, once <br />construction is complete. The entire project will be buried and <br />will not be visible. <br /> <br />Permitting <br /> <br />Permits Required: Central Weld County Water District will <br />construct the actual line, and will arrange for any permits <br />required. <br /> <br />No EA or EIS will be required. <br />there are no wetlands along the <br />will be on county road right of <br />Easements, if required, will be <br />Water District. <br /> <br />The subdivision is existing, and <br />pipeline route, and the pipeline <br />way, or on private land. <br />obtained by Central Weld County <br /> <br />Financial Plan <br /> <br />ARWP spends approximately $15,000 annually on power cost for well <br />and booster pumping, which translates into an operating cost of <br />about $0.50 per 1000 gallons. Operational costs also require a <br />contract operator at $7,800 per year, or about another $0.27 per <br />1000 gallons. The total operating cost/ excluding debt service, <br />but including billing and office administration is about $2.00 <br />per 1000 gallons. <br /> <br />Aristocrat Ranchette Water Project. Inc. <br />Feasibility Study <br /> <br />7 <br /> <br />... <br />