My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153607L Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153607L Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:31:36 AM
Creation date
10/5/2006 11:48:58 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153607L
Contractor Name
Trinchera Irrigation Company
Contract Type
Loan
Water District
35
County
Costilla
Bill Number
SB 92-87
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(Table of Contents, continued) <br /> <br />Chapter VII: PROJECT EVALUATION <br />A. General <br />B. Financial Evaluation <br />C. Summary <br /> <br />VlI-1 - VII-7 <br />VII-1 <br />VII-2 <br />VII-5 <br /> <br />Chapter VIII: FINANCIAL PROGRAM <br />A. Assessments <br />B. Financial Schedules <br /> <br />VIII-1 - VIII-4 <br />VIII-1 <br />VIII-2 <br /> <br />Appendices <br /> <br />Appendix A: Articles of Incorporation and By-Laws <br />Appendix B: Financial Statements <br />Appendix C: Water Rights <br />Appendix D: Boring Logs and Laboratory Testing <br />Appendix E: Geology Report <br />Seismology Report <br />Appendix F: Hydrology Report <br /> <br />List of Tables <br /> <br />Table I-1 Local Climatological Data <br />Table 1-2 Summary of Temperatures and Precipitation <br />Table 1-3 Summary of Climate Records <br />Table 1-4 Station Locations <br />Table III-1 Production or Land Served by Mountain Home Reservoir <br />Table IV-1 Water Rights <br />Table V-1 Dam Embankment Materials - Shear Strength Summary <br />Table V-2 Slope Stability Analysis Parameters <br />Table V-3 Slope Stability Summary <br />Table V-4 Summary of Borings and Laboratory Test Results <br />Table VI-1 Alternative No. 1 - Cost Estimate <br />Table VI-2 Alternative No. 1A - Cost Estimate <br />Table VI-3 Alternative No. 2 - Cost Estimate <br />Table VI-3A Alternative No. 2A - Cost Estimate <br />Table VI-4 Alternative No. 3 - Cost Estimate <br />Table VI-5 Alternative No. 3A - Cost Estimate <br />Table VI-6 Miscellaneous Alternative - Cost Estimate <br />Table VlI-1 Production On Land Served By Mountain Home Reservoir <br />Table VllI-1 Annual Financial Schedule - Lowest Cost Alternative <br />Table VIII-2 Annual Financial Schedule - Highest Cost Alternative <br />Table VIII-3 Annual Financial Schedule - No Project Cost Included <br /> <br />TC 2 <br />Mountain Home Reservoir <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.