My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153607L Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153607L Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:31:36 AM
Creation date
10/5/2006 11:48:58 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153607L
Contractor Name
Trinchera Irrigation Company
Contract Type
Loan
Water District
35
County
Costilla
Bill Number
SB 92-87
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />""I <br /> <br />TABLE OF CONTENTS <br />Feasibility Study for Mountain Home Reservoir <br /> <br />Executive Summary <br />Table of Contents <br /> <br />Chapter I: <br />A. <br />B. <br />C. <br /> <br />Chapter II: <br />A. <br />B. <br />C. <br />D. <br />E. <br /> <br />GENERAL INFORMATION <br />Project Map <br />Location <br />Climate <br /> <br />THE TRINCHERA IRRIGATION COMPANY <br />History of Organization <br />Laws Under Which Organized <br />Powers and Authorities of the Organization <br />Financial Status <br />Physical Assets <br /> <br />Chapter III: LAND <br />A. Land Classification <br />B. Service Area Map <br />C. Land Use <br />D. Land Ownership <br /> <br />Chapter IY: <br />A. <br />B. <br />C. <br />D. <br /> <br />Chapter Y: <br />A.l. <br />A.2. <br />B.l. <br />B.2 <br />C.l. <br />C.2. <br />D. <br />E. <br />F. <br />G. <br />H. <br /> <br />Chapter VI: <br />A. <br />B. <br />C. <br /> <br />IIATER <br />lIater Rights <br />lIater Utilization <br />Firm Yield <br />lIater Quality <br /> <br />PLAN OF DEYELOPMENT <br />Physical Plan <br />Structure Plan <br />Geotechnical Investigations <br />Soil and Rock Description <br />Geology <br />Seismological Considerations <br />Geotechnical Evaluation <br />Hydrologic And Hydraulic Evaluation <br />Drainage <br />Sedimentation <br />Right-Of-lIay <br /> <br />ESTIMATED COSTS <br />Costs of Construction <br />Total Project Cost <br />Fund Requirement Schedule <br /> <br />TC I <br />Mountain Home Reservoir <br /> <br />Paqe <br /> <br />I-I <br />I-I <br />I-I <br />I-I <br /> <br />II-I - II-2 <br />II-I <br />II-I <br />II-I <br />II-2 <br />II-2 <br /> <br />III-I - III-4 <br />III-I <br />1II-2 <br />1II-2 <br />1II-3 <br /> <br />IY-I - IY-3 <br />IY-I <br />IY-2 <br />IY-2 <br />IY-3 <br /> <br />Y-I - Y-33 <br />Y-I <br />Y-3 <br />Y-8 <br />Y-9 <br />Y-17 <br />Y-18 <br />Y-19 <br />Y-29 <br />Y-30 <br />Y-30 <br />Y-30 <br /> <br />YI-I - YI-4 <br />YI-I <br />YI-3 <br />YI-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.