Laserfiche WebLink
<br />I <br />I I <br />I <br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />. ...age i. <br /> <br />'I&~ Reservoir eompany <br />% Mr. Olarlie wilson, President <br />June 13, 1984 <br /> <br />determination of the minimum cross-section dLmensions for the auxiliary dam in <br />the sloughing area. 'ltle only solution to this problem may be to extend the <br />cross-section into the reservoir basin. <br /> <br />In the interest of public safety, the reservoir is hereby restricted to a <br />water level ten feet bel-ow the lowest point in the crest of ther dam. By copy <br />of this letter, the Division Engineer is directed to enforce this restriction, <br />but the responsibility for canplying with the restriction rests with the dam <br />owner. <br /> <br />'ltlis restriction is the minimum action your company can take to improve <br />the safety of the dam. Mditional actions may be necessary, based upon the <br />recomrendation of your engineer. You are reminded that as owner, you are <br />liable for the safety of this structure and that these minimum requirements do <br />not relieve you of that liability. F\!rther restrictions taken on a vo+untary <br />basis by you in order to protect yourself may be in order. <br /> <br />Conscientious operation of the dam by the owner is the key to maintaining <br />a safe structure. 'ltlis includes inspection, rronitoring, maintenance, and <br />timely repair. since the p..1blic's safety is at stake, failure to schedule and <br />perform the requested work will lead to further restriction of storage in the <br />reservoir. . <br /> <br />When the above items have been completed, the restriction on this <br />reservoir will be rerroved. Please sul:mit to this office a schedule for the <br />work by July 31, 1984. <br /> <br />If you have any questions, please contact Brian Ahrens of the Dam Safety <br />Branch of this office. <br /> <br /> <br />rely, <br /> <br /> <br />a. <br /> <br />ris A. Danielson <br />te Engineer <br /> <br />JADfBJA:pka <br /> <br />ee: Alan E. Pearson, Olief, Dam Safety Branch <br />James R. Clark, Division Engineer <br />Donald L. Brazelton, Water Comnissioner <br />'Fred Renner, Water COrnnissioner <br /> <br />. <br /> <br />.. ..---.. ~-. <br /> <br />A-2~ <br />