My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00307
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:53 AM
Creation date
10/5/2006 11:48:43 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C143617
Contractor Name
Allenspark Water and Sanitation District
Contract Type
Loan
Water District
0
County
Boulder
Bill Number
SB 75-468
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />~y <br /> <br />>1 <br /> <br />Colorado Water Conservation Board <br />,~ay 3, 1974 <br /> <br />Page 2 <br /> <br />3. Existing ~1nd Potent.iaJ Land Dcveloprlcnt: A sp.rvice area map shall be <br />prov.j,1cd as outl ined iq s13ction I of the r~port. which shall shnv' the <br />extert of existing develof>m'.~nt. An estin,ltC' '.;ill be made of the potpn- <br />tial development in the area, and incorporJted into the over<111 dcsi<,!n <br />of project faci I ities. Service to nearby ilreas including Ferncl iff and <br />the Triole Creek Ranch "Ii II be discussed as well as the effect of the <br />project on land development in the area. <br /> <br />4. Water Supply and Utilization. Desian requirements for wilter surrly will <br />be developed including the maxi"'ur, hourly. d"ily. "Ieekly, and monthly <br />use, both For existing development and ultinate projections. Any points <br />of "Iater 1055 will be estimated end included. The physical availability <br />of surfdce \'/<Jter on \-lill()ld Creek and Roc" Creek bill be discussed using <br />strearn gage rpcnrds and extrapol~tirlo them to the itudy ~rea locations. <br />The groundwater avai Jdble for both individual and co",muni ty supply vii II <br />be estir'latcd including a projectjr)n of future pumring Jt'v(~ls and re- <br />plenishment characteristics. The ~lroundwatcr invcstigatio.n v,i 11 include <br />additional evalu,ltion as required by the CWeB stafF. 1.later ri,ihts ,.Ji 11 <br />be investinated for Allcnspark, both from a leg,11 av,1ilability basis and <br />an actual i:f1plcmentJtion strcltegy. The ~"atcr riqhts aVil; l,Jble ~.Ji 11 be <br />listed along \.Jith priority d.:Jte <Jnd the acquisition and il~lplC'r:lentation <br />developed shmJing the probable yi,'ld of each ri"ht that is pl,mncd to be <br />acquired. The yields ~vi I J then be compart2d to a SUr1r1c1ry of water rc.quire- <br />me-nts to sho", hOl'1 supply meets the req"ir('l11pnts. The existina physical <br />and chemical qu,llity of both surfacp. supply und ground \rJ,lt~r \,olill be in- <br />vestigated and discussed, particularly for those parameters requiring <br />treatment for do~estic consumption. A discussion will be made of the <br />sedincntation problems aS5oci~ted with a diversion strLJcture. Treatnent <br />of filter backwash ,'Iater and 'projected effect on indivirlual septic sys- <br />tems ~'Ji 11 be included as they relate to "effluentl' \,oJaste\'/ater. <br /> <br />5. Plan of Development: Project phasing ,;ill be discussed in this secti"". <br />Initial requirements of the h'.Jter rCSOljrCC il')pl(~mentati()n stratcqy \'Jill <br />be discussed. Then the desiqn criteri.1 for both initial and ulti",ate <br />development wi II be establ ished :(.r the djv(~rsiDn dam, \....ater treatment <br />plant, ~....ells, stor<lge, and distribution systen. Prelir1inary soil inv(~s- <br />ti0,ations shall he {l\':H1e for mr)jor structures. Constructil)n techniques <br />and easement acquisition techniques ,"ill be discussed briefly. <br /> <br />6. Esti",atecl Project Costs: A summilry "Jill be nilde of the esti"'~tccl <br />constructi0n .JnJ total project costs in the form of an iternizen brcak- <br />dovm: This can be done usin,! CWCB format if desired. The project C<1r- <br />ital rO:;<luir"i.'ents ,.!ill be discussed and.:in allm.:ance made for !"Jrojected <br />price incr:.;C)c:;es. Or,,-..rc1tinn a"rl i'1.1i'ltcnancp costs ~'/i II he it':f"'i;:,~d and <br />the I.!ethod of est<lblishing an eMergency operating fund described. <br /> <br />7. Project Financial Evaluation: Alternate financing sch,.dules shall be <br />presented in this section to assist the CWCB in deter",ining the ap- <br />pI icant's payment capacity. A cOl'1parison of the required service rates <br />and charges "ith neighboring entities vJill be made. <br />
The URL can be used to link to this page
Your browser does not support the video tag.