Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Chapter I -Introduction <br /> <br />· Deteriorated intake pipe between the inlet and the gate chamber <br /> <br />· Deteriorated gate chamber <br /> <br />. Failed gate mechanism <br /> <br />Several alternatives are evaluated in this report for financial, technical, environmental, and <br />institutional feasibility. The alternatives included non-structural and structural measures. <br /> <br />The Company's originally were going to request a loan to construct the project. During the <br />development of this feasibility study, the Companies decided to construct the project with their own <br />funds. This study was funded with a grant from CWCB. <br /> <br />Horseshoe Dam No.2 Outlet Works Study <br /> <br />8 <br /> <br />BOYLE <br />