Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />Table of Contents <br /> <br />Certification <br />Acknowledgments <br />Executive Summary <br />Chapter I Introduction <br />Chapter II Description of Sponsoring Entity <br />Chapter III Background Informatiou <br />A. Study Area and Existing Facilities Description <br />B. Water Demands <br />C. Proj ect Lands <br />D. Water Rights <br />E. Water Quality <br />F. Field Investigations <br />Chapter IV Formulation of Alternatives <br />A. Alternative 1 - Upstream Gate <br />B. Alternative 2 - Gate Chamber <br />C. Alternative 3 - Gate Tower <br />D. No-Action Alternative <br />Chapter V Evaluation of Alternatives <br />A. Impacts <br />B. Institutional Considerations <br />C. Comparative Evaluation <br />Chapter VI Selection of Alternative and Financial Plan <br />A. Narrative Description <br />B. Hydraulic, Hydrologic, and Structural Design Criteria <br />C. Land and Right-of-Way Requirements <br />D. Project Implementation Schedule <br />E. Cost Estimates <br />F. Financial Program <br />G. Institutional Considerations <br />H. Benefits <br /> <br />7 <br />9 <br /> <br />12 <br />13 <br />13 <br />13 <br />17 <br />17 <br /> <br />19 <br />19 <br />20 <br />20 <br /> <br />24 <br />25 <br />25 <br /> <br />30 <br />30 <br />31 <br />31 <br />31 <br />32 <br />32 <br />33 <br /> <br />Horseshoe Dam NO.2 Outlet Works Study <br /> <br />F.!IO'r'LE <br /> <br />4 <br />