My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00304
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:17 AM
Creation date
10/5/2006 11:48:36 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0027X
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Grant
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Chapter 11I- Background lnfonnation <br /> <br />· Deteriorated intake pipe between the inlet and the gate chamber <br /> <br />· Deteriorated gate chamber <br /> <br />· Failed gate mechanism <br /> <br />B. Water Demands <br /> <br />The purpose of this project is strictly limited in scope to the rehabilitation of outlet works. No <br />additional water supplies will be developed in connection with this project. No new or increased <br />diversions will be made and no additional storage capacities will be created at Horseshoe Reservoir. The <br />uses of the water will not change as a result of this proj ect. This proj ect will not increase the <br />Companies' water supply. <br /> <br />C. Project Lands <br /> <br />Greeley and Loveland Irrigation system will not change as a result of this project. This project <br /> <br />will not broaden the Companys' service area and will not provide for the irrigation of any new lands. <br /> <br />D. Water Rights <br /> <br />There are two points of diversion for the Greeley and Loveland Irrigation system which include <br />the Big Bames Ditch and Loveland and Greeley Canal. The Big Barnes Ditch diverts water from the <br />Big Thompson River into Lake Loveland as shown on Figure III-1. Tlie water is then conveyed into <br />Horseshoe Reservoir by Lake Loveland's north outlet. The water is then regulated into Boyd Lake or <br />into Heinricy Lake. The water is then regulated into Boyd Lake once again or into Upper and Lower <br />Hoffman Lakes. Westerdoll Lake presently collects local drainage and the water is then regulated into <br />Upper and Lower Hoffman Lakes. The water is then regulated into the Greeley and Loveland Canal at <br />Hubbs Check. The water is then conveyed via Greeley and Loveland Canal into Equalizer Reservoir. <br />Equalizer Reservoir regulates the water in the Greeley and Loveland Canal system for agricultural use <br />east of Loveland. <br /> <br />Horseshoe Dam No.2 Outlet Works Study <br /> <br />13 <br /> <br />BOYLE <br />
The URL can be used to link to this page
Your browser does not support the video tag.