Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />VII. COSTS OF ALTERNATIVES <br /> <br />Thi s sect i on of the report presents the tota 1 costs of each of <br />the two spillway alternatives presented herein for Fuchs Dam. Tables <br />5-A and 5-B present the detailed construction costs, including <br /> <br />25 percent for <br />includes final <br /> <br />contingencies, <br />design and <br /> <br />and the engineering costs, which <br />construction inspection for each <br /> <br />alternati ve. <br /> <br />The total costs for each alternative are summarized as follows: <br /> <br />Alternative No. 1 <br /> <br />Alternative No.2 <br /> <br />1. Construction Costs <br />2. Plus 25% Contingencies <br /> <br />$78,510 <br />19,630 <br /> <br />$73,810 <br />18,450 <br /> <br />Subtota 1 <br /> <br />$9B,140 <br /> <br />$92,260 <br /> <br />2. Plus 12% Engineering & <br />Construction Services <br /> <br />11,780 <br /> <br />11,070 <br /> <br />TOTAL <br /> <br />$109,920 <br /> <br />$103,330 <br /> <br />The above costs are based upon 19B2 pri ces and any delay in <br /> <br />construction will require an escalation factor of about 10 percent per <br /> <br />year. <br /> <br />- VII-1 - <br />