My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00301
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2010 3:02:48 PM
Creation date
10/5/2006 11:48:30 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153442
Contractor Name
Fuchs Ranches, Inc.
Contract Type
Loan
Water District
20
County
Rio Grande
Bill Number
HB 83-1102
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />VII. COSTS OF ALTERNATIVES <br /> <br />Thi s sect i on of the report presents the tota 1 costs of each of <br />the two spillway alternatives presented herein for Fuchs Dam. Tables <br />5-A and 5-B present the detailed construction costs, including <br /> <br />25 percent for <br />includes final <br /> <br />contingencies, <br />design and <br /> <br />and the engineering costs, which <br />construction inspection for each <br /> <br />alternati ve. <br /> <br />The total costs for each alternative are summarized as follows: <br /> <br />Alternative No. 1 <br /> <br />Alternative No.2 <br /> <br />1. Construction Costs <br />2. Plus 25% Contingencies <br /> <br />$78,510 <br />19,630 <br /> <br />$73,810 <br />18,450 <br /> <br />Subtota 1 <br /> <br />$9B,140 <br /> <br />$92,260 <br /> <br />2. Plus 12% Engineering & <br />Construction Services <br /> <br />11,780 <br /> <br />11,070 <br /> <br />TOTAL <br /> <br />$109,920 <br /> <br />$103,330 <br /> <br />The above costs are based upon 19B2 pri ces and any delay in <br /> <br />construction will require an escalation factor of about 10 percent per <br /> <br />year. <br /> <br />- VII-1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.