My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00300
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:16 AM
Creation date
10/5/2006 11:48:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153643
Contractor Name
Morgan County Quality Water District
Water District
0
County
Morgan
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I . <br /> <br />, . <br /> <br />I <br /> <br />I <br /> <br />. <br /> <br />I <br /> <br />I <br /> <br />. <br /> <br />I <br /> <br />I <br /> <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />. <br /> <br />PROJECT SUMMARY <br /> <br />The quality of drin~ing water available to much of rural Morgan County <br />is considerably inferior to State and Federal drinking..mter standards. A <br />group of Morgan County rural residents formed the Morgan County Quality <br />Water Association to evaluate potential water supplies and investigate the <br />economic feasibility of constructing and operating a rural domestic water <br />system. <br /> <br />Ground-water supplies from three different aquifers were investigated <br />on behalf of the Association. Recommendations were made to acquire water <br />from the Hay Gulch alluvium, located near the west boundary of the proposed <br />service area. A supplemental supply to serve the lower end of the service <br />area, if needed, can be obtained from the Camp Creek alluvium near the <br />eastern Morgan County boundary. These supplies were determined to be of <br />sufficient quantity and quality to adequately serve the projected needs <br />of the proposed district. The water-supply report, completed as a separate <br />study, is included with the following feasibility study as Appendix A. <br /> <br />The following feasibility study contains a preliminary design for a <br /> <br /> <br />water-supply and distribution system to serve a major portion of the irri- <br /> <br /> <br />gated area of Morgan County. The service area contains approximately 280 <br /> <br /> <br />square miles, including the communities of Goodrich, Orchard, Weldona, <br /> <br /> <br />Snyder and Hillrose. The estimated total cost of the system, including <br /> <br /> <br />water supply, construction costs, legal and engineering fees, contingencies <br /> <br /> <br />and inflation during construction is $7,647,000. The feasibility study <br /> <br /> <br />presents a proposed rate schedule to cover payment of this obligation plus <br /> <br /> <br />operation and maintenance costs. <br /> <br />M. W. UITTINGER AND ASSOCIATES, ING. <br />
The URL can be used to link to this page
Your browser does not support the video tag.