Laserfiche WebLink
<br />TASK DESCRIPTION, Task 16. - Continued <br /> <br />abstracts of bids on similar types of work to the extent possible. Both <br /> <br /> <br />USBR and private bid abstracts will be used. The use of approximated cost <br /> <br /> <br />curves will be avoided. An allowance of 20% will be made for contingencies <br /> <br /> <br />and 15% for engineering and management during construction. Financing <br /> <br /> <br />costs will not be included. <br /> <br />17. Detennine Annual Operation, Maintenance, and Replacement Costs - These <br /> <br /> <br />costs will be based on the assumption that local entities will perform the <br /> <br /> <br />work with a salaried "",nager, part time labor, and their own or rented <br /> <br /> <br />equipment. <br /> <br />18. Preparation of Final Report - A proposed report outline is presented in <br /> <br /> <br />paragraph G. Revisions will be made as necessary during the course of the <br /> <br /> <br />study. <br /> <br />G. Report Outline <br /> <br />CHAPTER I - General <br />a. Location <br />b. Description of area <br />c. Climatological data <br /> <br />CHAPTER II - Service La~ds <br /> <br /> <br />a. Land Classification <br /> <br /> <br />b. Potential ser>ice areas <br /> <br /> <br />c. Crops <br /> <br />d. Potential trace-offs <br /> <br /> <br />-10- <br />