My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00285
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:16 AM
Creation date
10/5/2006 11:47:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C143602
Contractor Name
Rocky Mountain Consultants
Contract Type
Grant
Water District
0
County
Boulder
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />.. <br /> <br />~. <br /> <br />classified with respect to the current status, and the <br />yields of these water rights on a twenty-year average <br />for the probable transferability of such rights as may <br />be untransferred. This analysis is to include research <br />of all transferred decrees as set forth by the district <br />court so as to generate a data base upon which future <br />transfers can be based. In addition, this section of the <br />study will also set forth water rights acquisition policies <br />that any of the munxcipalities have and set forth judgments <br />with respect to the adequacy of these programs. <br /> <br />b. The report shall compile and set forth all existing data <br />with respect to average and maximum demands of the munici- <br />palities and correlate these demands with the water rights <br />currently owned by the municipalities. <br /> <br />c. A base map shall be prepared showing all of the current <br />master plans being followed by the municipalities and how <br />these master plans integrate with one and other to reflect <br />the basin development program as each municipality views <br />this program. From these master plans and other data <br />basis as required by the State of Colorado, population <br />projections will be set forth based on a probable minimum <br />and maximum growth potential envelope. <br /> <br />d. With the generation of the above described envelope, water <br />augmentation plans shall be developed to satisfy the future <br />demands as set forth by the growth envelope. These aug- <br />mentation plans shall consider the effects of the authorized <br />Narrows Project concerning any effect such project will <br />have upon the proposed Coal Creek Reservoir to store South <br />Boulder and Coal Creek,water. Following this analysis, <br />augmentation plans shall be developed which will consider <br />the utilization of underground mines, purchase of water <br />from the city of Denver, and purchase of direct flow or <br />storage rights from other water users in the Coal Creek <br />and South Boulder drainage basins. These costs shall be <br />based on depletions utilizing the Blaney-Criddle formula <br />for calculating said depletions. The various plans of <br />augmentation shall be presented in terms of yields and <br />costs of the proposed augmentation plans. <br /> <br />e. Conclusions shall be drawn with respect to the adequacy, <br />availability, location, and cost of water from Coal Creek <br />basin in general and the Coal Creek Reservoir in particular. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.