My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00283
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00283
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:16 AM
Creation date
10/5/2006 11:47:37 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0009X
Contractor Name
Swink, Town of
Contract Type
Loan
Water District
0
County
Otero
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />PROJECT SUMMARY <br /> <br />The Town of Swink, Colorado is located in Otero County, approximately 5 miles <br />northwest of La Junta, Colorado. Throughout it's history, Swink has remained <br />a small rural community with a relatively stable population and an agricultural <br />orientated economy. Since 1970 a surge in population growth has occurred. <br />Population increased from a census count of 381 in 1970 to an estimated count <br />of 627 in 1976. <br /> <br />The Town's water system is a dual system with "soft" water derived from two <br />low capacity deep wells, partially treated f~r iron removal, and furnished <br />to the residents for potable consumption. The "hard" water system is supplied <br />by high capacity shallow wel1saand distributed to the residents for non-potable <br />use; irrigation and wastewater removal. Storage is provided by a 50,000 gallon <br />elevated tank on the soft water system and a 25,000 gallon elevated tank on the <br />hard water system. Distribution mains on both systems are predominately <br />4" and 2" lines constructed of a variety of piping materials. Numerous breaks <br />and failures of the mains have occurred in recent years. <br /> <br />The ability of the present water facilities to meet fire flow demands in <br />accordance with the Mountain States Inspection Bureau requirements is practically <br />non-existent. ' The distribution mains are undersized, partially plugged by <br />corrosion and scaling, contain inadequate pressures, and in some areas are <br />inadequately looped. Fire hydrants are inadequately spaced, undersized, and <br />almost inoperable due to age, non-use, and abuse. Elevated storage capacity at <br />an adequate pressure is approximately 1/3 of the capacity needed to meet <br />requirements for 1976. <br /> <br />The existing "soft" water supply wells are operating near maximum capacity. <br />Additional quantities of "soft" water are virtually unobtainable. The exist- <br />ing "soft" water supply is chemically undesirable for potable consumption, <br />failing in many aspects to meet the quality standards recommended by the U.S. <br />Public Health Service for human consumption. Both the "hard" and "soft" water <br />contain many similiar chemical characteristics which render either water diffi- <br />cult and expensive to treat. Since additional supplies of potable water are <br />not available within a reasonable period of time, treatment of the alluvial <br />water supply by reverse osmosis is recommended as the only feasible alternative. <br /> <br />Due to the high unit cost of treating the water for potable consumption, the dual <br />system concept is maintained. Improvements are:'proposed which provide an~" <br />acceptable quality of water meeting U.S. Public Health Service Standards in <br />adequate quantities to meet the projected needs for potable use through the <br />year 1995. The distribution system and storage capacity for the potable water <br />supply will be improved to provide fire flows to the existing town with provisions <br />for future extensions. The distribution system for the non-potable water supply will <br />be supplemented and looped to increase flows and pressures to outlying areas. <br /> <br />Existing water rates although not excessively low at the present time are in- <br />adequate~to construct and operate additional system facilities. Subst~ntial <br />rate increases are necessary to provide funds for debt~service retirement and <br />to meet projected operation and maintenance expenses on the proposed improvements. <br />Proposed rate schedules are included in the report for adoption depending on the <br />type of financing obtained. <br />
The URL can be used to link to this page
Your browser does not support the video tag.