Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />8. PROJECT EVALUATION <br />8.1 Stage I Construction <br />8.2 Stage II Construction <br /> <br />9. FINANCIAL PROGRAM <br />9.1 Financial Feasibility of Project Income vs. Expenses <br />9.2 Recommendations on Funding <br /> <br />10. CONCLUSIONS AND RECOMMENDATIONS <br />10.1 Conclusions <br />10.2 Recommendations <br /> <br />APPENDIX AI. <br />A2. <br />A3. <br /> <br />Audit Report;1974) complete <br />Audit Report ,(1973) Water Fund <br />Audit Report (1972) Water Fund <br /> <br />PLATES <br />I. <br />II. <br />III. <br /> <br />.Physical Plan - Existing Water System <br />Proposed Initial Improvements (1977-78) Potable Water <br />Proposed Initial Improvements (1977-78) Non-Potable Water <br /> <br />LIST OF FIGURES <br />I. Design Area (2020) <br />II. Population and Growth <br />III. Water System Improvements (1995-2020) <br />IV. Reverse Osmosis System - Schematic <br />V. Dual Media Ion Exchange System <br /> <br />LIST OF 'TABLES <br />1. Climate Data for the Rocky Ford 2 SE Station No. 7167 <br />2. Comparison of Water Production Values <br />3. Future Water Production Requirements <br />4. Minimum Supply Rate and Storage Requirements <br />5. Tabulation of Operating, Maintenance & Replacement Costs <br />6. Hookup Projection <br />7.0 Six-Year Cash Flow Schedule <br /> <br />Page <br /> <br />47 <br />47 <br />48 <br /> <br />49 <br />49 <br />51 <br /> <br />53 <br />53 <br />53 <br /> <br />In Rear <br />In Rear <br />In Rear <br /> <br />In Rear <br />In Rear <br />In Rear <br /> <br />9 <br />21 <br />24 <br />26 <br />27 <br /> <br />1 <br />6 <br />8 <br />10 <br />42 <br />46 <br />50 <br />