Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Site Acquisition for Storage Tank & Treatment <br />Facilities <br /> <br />$ 1,500.00 <br /> <br />Construction Easements for Storage Tank & <br />Treatment Facilities <br /> <br />500.00 <br /> <br />Distribution Main Easements <br /> <br />300.00 <br /> <br />"_ Interest during Constructiori'~:(~. 5%)+ <br /> <br />16,625.00 <br /> <br />Engineering Fees: Planning, Design, <br />Surveys, Soils, Specifications, <br />Estimation @ 8%+ . <br /> <br />53,200.00 <br /> <br />Engineering Supervision & Resident <br />Inspection @ 4% + <br /> <br />26,600.00 <br /> <br />Administrative and legal Costs @ 2%i <br /> <br />13,300.00 <br /> <br />Fiscal Costs for Loan or Bond Program <br /> <br />Sub-Total Other Costs (Stage I) <br /> <br />.9~975.00 <br />$122,000.00 <br /> <br />Other costs for Stage II construction are estimated as follows: <br /> <br />Site Acquisition for Storage Tank <br /> <br />$ <br /> <br />500.00 <br /> <br />Construction Easement for Storage Tank <br /> <br />200.00 <br /> <br />Interest during Construction (2.5%)i <br /> <br />8,900.00 <br /> <br />Engineering Fees: Planning, Design, etc. @ 8%+ <br /> <br />28,400.00 <br /> <br />Engineering Supervision: Resident <br />Inspection @ 4%+ <br /> <br />14,200.00 <br /> <br />Administration and Legal Costs @ 2% + <br /> <br />7,100.00 <br /> <br />Sub-Total Other Costs (Stage II) <br /> <br />5,200.00 <br />$ 64,500.00* <br /> <br />Fiscal Costs for Loan or Bond Program <br /> <br />*The Stage II other costs are based on 1976 prices and will be adjusted to 1995 <br />prices by an escalation multiplier. <br /> <br />-34- <br />