My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00281
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00281
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:13:19 AM
Creation date
10/5/2006 11:47:35 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153670B
Contractor Name
Ute Water Conservancy District
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
SB 88-30
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />'..V <br /> <br />o. <br />. <br /> <br />~ <br /> <br />6 <br /> <br />. <br /> <br />. <br /> <br />APPLICATION FOR STATE WATER PROJECT <br /> <br />TO: Colorado Water Conservation Board <br />823 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203. <br /> <br />1. Name of Applicant(s) (Sponsor(s): LAWRENCE AUBERT, GENERAL MANAGER <br /> <br />n~R WATRR ~ON~F.RVANCY DISTRIC~ <br /> <br />Mailing Address: P. o. BOX 460 <br />GRAND JUNCTION, CO 81502 <br />Telephone Number: 303-242-7491 <br />2. Briefly describe the purpose, location and need for the project: <br /> <br />THE UTE WATER CONSERVANCY DISTRICT WATER TREATMENT PLANT HAS A <br />CAPACITY OF 22 MGD AND PRE-DESIGNED EXPANSION CAPACITY TO 42 <br />MGD. .CURl.{ENT PEAK CUSTOMER DEMANDS ARE 10 MGD. THE 24" <br />DIAMETER, REINFORCED CONCRETE PIPELINE WHICH DELIVERS THE <br />PRIMARY RAW WATER SOURCE, IS APPROXIMATELY 18 MILES IN LENGTH, <br />WAS INSTALLED IN THE EARLY 1960's, AND HAS A DELIVERY CAPACITY <br />OF 10.2 MGD. <br /> <br />IN ORDER TO MEET FUTURE DEMANDS, THIS PIPELINE WILL HAVE TO <br />BE UPGRADED. IT IS ANTICIPATED THAT "UPGRADING" CAN BE <br />ACCOMPLISHED IN PHASES, AND THAT EACH PHASE WILL RESULT IN <br />A PROPORTIONAL FLOW CAPACITY INCREASE. THE PROPOSED PHASE I <br />IS THE SUBJECT OF THIS APPLICATION AND IS LOCATED NEAR THE <br />CONFLUENCE OF PLATEAU CREEK WITH THE MAINSTEM OF THE COLORADO <br />RIVER. <br /> <br />THIS EXISTING PIPELINE SECTION INCLUDES A SHARP VERTICAL RISE, <br />A 2,800 FOOT TUNNEL, AND A SHARP VERTICAL DECLINE. <br /> <br />SEE ENCLOSURES <br /> <br />THE INTENT WILL BE TO REDUCE OR MINIMIZE FRICTION LOSSES <br />BY INSTALLING A LARGER DIAMETER PIPE PARALLEL OR IN AN <br />ALTERNATE ROUTE AND INSURING RELIABILITY AND ACCESS. <br /> <br />-13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.