Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Alternative No.1: Cost $622,000 <br /> <br />Alternative No. 1 is for rehabilitation of the existing dams <br />to attain the decreed water level of Gage Height 24.0. The dam is <br />at 3:1 slopes and the location of the spillway is between the two <br />dams near the east abutment of the West Dam. The total project <br />cost was estimated at $622,000 and an increase in storage of 1532 <br />acre-feet is realized with the rehabilitation. <br /> <br />The Total Project Cost including interest: <br /> <br />$622,000 x 0.07501 x 40 = $1,866,249 <br /> <br />The Cost per acre-foot of water storage gained is: <br /> <br />$1,866,249 + 1532 = $1218 I acre-foot <br /> <br />The annual cost for the 40 year project loan: <br /> <br />$1218 + 40 years = $30.45 I acre-foot I year <br /> <br />The value of the water storage gained: <br /> <br />1532 acre-feet x $1,000 = $1,532,000 <br /> <br />If the value of the wate~ is evaluated in terms of the crop <br />production produced by the ir~igated land versus dry land farming, <br />the water stored in Reservoi~ No. 2 would be worth $615,910- <br />$240,638 = $375,272 per yea~ as shown by the analysis in Table <br />VII-I. Thus the cost of the ~ehabilitation is worth two years of <br />irrigated crop production. As previously stated this figure <br />assumes a total loss of ability to irrigate the 3400 acres served <br />by No.2. This is not the true case but is a good comparison to <br />show the true worth of water erom a production standpoint. <br /> <br />Alternative No.2: Cost $689,860 <br /> <br />/ <br /> <br />Alternative No. 2 is for rehabilitation of the existing dams <br />to attain the decreed max~mum water level of Gage Height 24.0 <br />feet. The dam is at 4:1 upst~eam slopes, 3:1 downstream slopes, <br />and the spillway at the West pam location. The total project cost <br />was estimated at $689,860 and an increase in storage of 1532 acre- <br />feet is realized. <br /> <br />The Total Proiect Cost including interest: <br /> <br />$689,860 x 0.07501 ~ 40 = $2,069,856 <br /> <br />The Cost per Acre-foot ot water storage gained is: <br /> <br />$2,069,856 + 1532 = $1351 I acre-foot <br /> <br />VII-3 <br />