Laserfiche WebLink
<br />- - - - - - - - - - - - - - - - - - - <br /> TABLE VI - 3 <br /> tal1lI PCUaU: RESrn\\)IR 00. 2 <br /> PRaIllINARY ESTDlATE CF =<ll = <br /> RAISE llAl! CREST TO G.H. 34 ; R!PAIR EXISTOO llAl!: 3 TO 1 ramsI1lEl\ll SIJ:lml ; 4 TO 1 lJPSI'REAM suns <br /> SPILLIlAY AT SPllLlIAY AT <br /> 1IEST llAl! EASTllAl! <br />lTDl DImlIPITCN QWmTY UNITS I.Il1T llX:ATI<ll llX:ATIOl <br /> PRICE AIOlllr QWmTY AlD.lNT ~ A>IlNl' <br />1 It:>bilizatioo, Dewatering, llisc 1.00 L.S. $25,000.00 $25,000.00 <br />2 Stripping - East Dam 1.00 Acres $2,000.00 $2,000.00 <br /> Vest Dam 1.60 Acres $2,000.00 $3,200.00 <br /> Spillway Acres $1,000.00 $0.00 10.00 $10,000.00 8.00 $8,000.00 <br />3 EKcavatioo - East Dam 4000.00 C.Y. $1. 75 $7 ,000.00 <br /> Vest Dam 4100.00 C.Y. $1. 75 $7,175.00 <br /> Spillway C.Y. $1. 50 $0.00 22000.00 $lJ ,000.00 S6OOO.00 $84,000.00 <br />4 Fill - East Dam 28700.00 C.Y. $1. 50 $4J ,050.00 <br /> West Dam 50300.00 C.Y. $1.50 $75,450.00 <br /> Spillway C.Y. $1. 25 $0.00 3500.00 $4,375.00 1??oo.00 $12,500.00 <br />5 Breach Excavatioo , Fill D5OO.00 C.Y. $3.50 $47,250.00 <br />6 Borrow Exca.vatioo C.Y. $1.00 $0.00 58900.00 $58,900.00 33000.00 $33,000.00 <br />7 O'Ierexcavatioo - East Dam 6200.00 C.Y. $1. 15 $7,750.00 <br /> Vest Dam llJOO.OO C.Y $1.25 $14,125.00 <br />8 Toe Drain w/ Pipe lSOO.OO L.r. $10.50 $15,750.00 <br />9 OJ.t1et Works - Ccncrete 140.00 C.Y. $360.00 $50,400.00 <br />10 OJ.tlet Gate - 36' 1.0. 1.00 L.S. $10,500.00 $10,500.00 <br />11 Outlet Pipe, 36" I.D.~ BmlOO 185.00 L.r. $200.00 $37,000.00 <br /> SMID BEDDOO 185.00 L.r. $140.00 $25,900.00 <br />12 Rem::rve Riprap - East Dam 0.20 Acres $3,000.00 $600.00 <br /> \fest Dam 0.50 Acres $3,000.00 $1,500.00 <br />13 Riprap - East Dam 3100.00 C.Y. $16.00 $49,600.00 <br /> Vest Dam 5700.00 C.Y. $16.00 $91,200.00 <br /> Spillway C.Y. $16.00 $0.00 800.00 $12,800.00 1200.00 $19,200.00 <br />14 Riprap Bedding - East Dam 1150.00 C.Y. $15.00 $17,250.00 <br /> Vest Dam 2200.00 C.Y. $15.00 $33,000.00 <br /> Spillway C.Y. $15.00 $0.00 300.00 $4,500.00 450.00 $6,750.00 <br />15 Coocrete /FJrs:geocy Spillway 100.00 C.Y. $190.00 $19,000.00 <br />16 Road SUrface/Gravel-East Dam 175.00 C.Y. $17.75 $3,106.25 <br /> Vest Dam 250.00 C.Y. $17.75 $4,437.50 <br />17 SeediJq & Topsoil - East Dam 1.00 Acres $3,000.00 $3,000.00 <br /> Vest Dam 1.40 Acres $3,000.00 $4,200.00 <br /> Spillway Acres $2,000.00 $0.00 10.00 $20,000.00 8.00 $16,000.00 <br /> 'lUrnL $598,443.75 $742,018.75 $m,893.75 <br />