Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />B. Total Project Cost. The following tabulation shows the total <br />estimated project costs for the three alternatives shown above. <br /> <br />Alternative No. 1 <br /> <br />West Spillway East Spillway <br /> <br />Feasibility Study <br />Construction <br />Engineering, Legal, and <br />Contingencies @ 30% <br />Right-of-Way <br /> <br />$ 23,353 <br />$460,223 <br /> <br />$138,067 <br />o <br /> <br />$ 23,353 <br />$546,998 <br /> <br />$164,099 <br />$ 10,000 <br /> <br />$744,450 <br /> <br />$621,643 <br /> <br />Alternative No.2 <br /> <br />West Spillway <br /> <br />East Spillway <br /> <br />Feasibility Study <br />Construction <br />Engineering, Legal,and <br />Contingencies @ 30% <br />Right-of-Way <br /> <br />$ 23,353 <br />$512,698 <br /> <br />$153,809 <br />o <br /> <br />$ 23,353 <br />$599,473 <br /> <br />$689,860 <br /> <br />$179,842 <br />$ 10,000 <br /> <br />$812,668 <br /> <br />Alternative No. 3 <br /> <br />West Spillway <br /> <br />East Spillway <br /> <br />Feasibility Study <br />Construction <br />Engineering, Legal and <br />Contingencies @ 30% <br />Right-of-Way <br /> <br />$ 23,353 <br />$742,019 <br /> <br />$222,606 <br />$ 90,000 <br /> <br />$1,077,978 <br /> <br />$ 23,353 <br />$777,894 <br /> <br />$233,368 <br />$100,000 <br /> <br />$1,134,615 <br /> <br />VI-2 <br />