My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00279
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:39:04 PM
Creation date
10/5/2006 11:47:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153572
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 85-1042
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />foundation soils. A core trench of this nature is recommended <br />for both dams; however, it is not a requirement for the East Dam. <br />The core trench is not optional for the West Dam due to its known <br />underseepage. <br /> <br />A toe drain was considered for both dams and is highly <br />recommended. A toe drain is a relatively inexpensive way to <br />ensure stability of the downstream toe and it also satisfies the <br />State Engineer's requirement that the seepage be controlled. From <br />a purely analytical standpoint, a toe drain is not absolutely <br />required for the East Dam as no seepage problems were detected by <br />this study. For the West Dam; however, a toe drain is mandatory <br />to control the seepage which is readily apparent at the dam toe. <br />As stated previously, we do recommend a toe drain of some sort at <br />both dams and believe the benefits will always outweigh the cost. <br /> <br />The riprap design for the upstream slope consists of a <br />twenty-four inch (24") layer of riprap with a nine-inch (9") layer <br />of riprap bedding. The riprap sizing will range from eighteen <br />inches (18") to three inches (3"), and the bedding from three <br />inches (3") to sand size. If present costs of the rehabilitation <br />become a problem, the thickness of the riprap layer could be <br />reduced to 18 inches to reduce the cost. However, more long term <br />maintenance can be expected if a thinner layer is utilized. <br /> <br />2. Outlet Works. The outlet works considered utilizing is <br />a 36 inch reinforced concrete pipe to replace the existing 36 inch <br />conduit. This size of outlet should be adequate to serve the <br />downstream needs as it is presently doing. Due to the extreme <br />length of the outlet (367 feet), it does not appear cost effective <br />or needed to increase the size. The pipe will be bedded on <br />concrete through the dam and on sand outside of the dam toe. The <br />inlet will be a simple headwall arrangement, and the outlet end <br />will include an energy dissipater and a Parshall flume to measure <br />flows. The wetwell will be cast-in-place concrete with a control <br />gate similar to the existing arrangement. A more sophisticated <br />outlet works is not considered necessary for a dam this size with <br />the storage capacity available. <br /> <br />3. Spillway. Two locations were studied for placement of <br />the emergency spillway. The plan view drawing in Appendix H of <br />this report shows the two proposed locations. Both locations have <br />pluses and minuses associated with them due to structural consid- <br />erations and downstream hindrances. <br /> <br />The spillway located on the east side of the East Dam is the <br />preferred location from a hydraulic standpoint and from a <br />structural standpoint. This spillway is shorter and gets the flow <br />into the natural drainage with less probability of a washout which <br />could back water up again&t the dam toe. This spillway will <br />require a large quantity of excavation and also will require the <br />purchase of 6 to 8 acres Right-Of- Way across a private landowner. <br /> <br />V-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.