Laserfiche WebLink
~ • <br /> S TAGECUACII II ES ELiVOlR ['ROJ ECT - ECP Ib-UEL-88 14: 57:79 Pg 12 , o <br />. . <br />____ <br />_______________________________________________ <br />______________ <br />___________ <br />________________ <br />_____________________________________________________;i <br /> Commitments 7/ Reference Page Froject Stage Responsible Commnnts <br />' Document Number (MOnitoring)I/ and <br /> <br />____ <br />_______________________________________________ <br />______________ <br />___________ Dsgn Const ObM <br />________________ Party Commitment Status ' <br />_______________________________________________________ <br />48. DYWCD will minimize disturbance in the FES 19, 119, X X UYWCD -5/18/87 Included in spec if ica[ions. <br /> wildlife areas and other parts of the 177, ]57 Successful -Discussed a[ Drecons[rut [ion meeting. <br /> landscape by confining construe Cion Bidder,(CJ180) <br />~' activities to areas actually needed for ' <br /> project purposes. <br /> IA 50 foot buffer would be maintained on each <br /> side of the stream.) <br />49. UYWCD will assure that temporary construction FES 22.49, X % UYWCD -11/1]/87 A co nt rete batch plan[ has <br /> facilities will he located below [he high 50, ]58 Success CUl been located above the high water line <br /> water line to minimize the removal of Bidder,(W 150 )on [he le[t abutment. This will later <br /> vegetation and excessive changes of the be developed into an overlook. Plans <br /> landscape. have not ye[ been completed. • <br />80. UYWCD will assure that the river is diverted FES l4 X X UYWCD -11/17/87 Commitment is currently <br /> th rough the outlet works during construction Successful being accomplished. <br /> and that the DOW is notified at leas[ one Bidder,(GJ180) <br /> week prior to diversion. <br />' St. UYWCD will assure that construction materials FES 22, 758 % X UYWCD -11/13/87 mee [ing: Observation indicates <br /> for project features are obtained from the Successful this commitment is being met. <br /> reservoir basin or existing quarries, in eidde r,(GJI50) <br />_ accordance with Roue County regulations. <br /> Finished borrow areas will be designed so as <br /> not [o be a safety or visual problem and <br />_ would drain during normal drawdown. <br />52. UYWCD will assure that wasted earthen FES ]88 X X UYWCD -5/18/87 There will be no disposal in <br /> construction material not suitable for Successful [he basin of toxic or hazardous <br /> construction purposes in the reservoir basin Bidde r,(CJ 150)ma[e rial. <br /> will he disposed of below the 30 foot draw <br /> down limit or shaped aesthetically. <br />T7? ?77?77?......STATUS: CONPLP.TE......7777?77717 . . .............. .......... ................. ........................................................ <br />8J UYWCD will selectively clear the reservoir FES 49 X % ~ UYWCD -ll/17/87 Clearing will De done <br />. rior to filling Success[ul under [he direction of the DOW, <br /> . <br />p Bidder,(GJ180)-]/2/88 Upper end of reservoir has 6 <br />- cleared as per US BR letter dated 2/25/88 <br />177 7???7?7......STAIUS: COMPLETE......?777777177 . . .............. .......... ................. ................_............. ............ <br />............. <br />54. UYWCD will assure that the vegetation will be FES 20 % X P <br />UYWCD, DOW 5/18/87 DOW and FWS will rovide <br /> cut as per negotiated with DOW, and removed Successful recommendations. <br /> from [he reservoir area during clearing, eidde r,(GJ 180)-Removal will be done Dy burning. <br />55. UYWCD will assure the BR temporarily FES 19, 78, X X UYWCD -11/17/87 mee [ing: oDServed <br /> disturbed landscape is rehabilitated to the 757 Successful revegetation of CR 16 in progress. <br />~" extent passible [o restore maximum wildlife LGA App. Q Bidde r,(GJ 180)the DOW. <br /> values. <br />- 56. UYWCD will assure RR that all disturbed FES 8-4,23, X X UYWCD -7/19/87 UYWCD agreed to use indigenous <br /> areas, includinP, pnwe dine construction, 49. 50 Success(ul species. <br /> outside the reservoir basin are restored, 758 Bidde r,(GJ 150) <br />