Laserfiche WebLink
<br />STAGECOACII RESERVOIR PRO] ECt - ECP <br />Cammitmen is 7/ <br />$45,000 per year for the next Il years of <br />park operation. <br />~' 47. UYWCD will allow the reservoir [o be zoned <br /> for rec reatien uses as recommended by the <br /> Colorado Division of Parks and Du [door <br /> Recreation and [he Co In rado Division of <br /> Wildlife. -These zones will include: a speed <br /> boating b water skiing area east of the <br /> marina; a sailing b wakeless area with a <br /> swimming site near the campground{ an area <br /> with vehicles on west end restricted (or <br /> waterfowl hunting. Duoys would mark zones. <br />44. UYWCD will install marker buoys, guardrails, <br /> fences, and sirns as necessary to protect [he <br /> public at areas such as the inlet, around all <br /> mechanical and electrical facilities, <br /> <br />' non-swimming areas and trail heads. <br />~ <br />45. DDP will allow open fires only in the <br /> Campground and picnic areas. <br />16-DEC-88 14:57:]9 Pg 11 <br />Reference Page Protect Stage Responsible <br />Document Number ~ (NOni to ri ng)1/ <br />Dsgn Const 06N Party <br />FES I5, 16 <br />J56 <br />FES 25 <br />FES 19, ZO <br />CONStRUCTION <br />46. Cm~struc Lion Activities will be monitored by FES <br />the. UYWCD, the Colorado State Engineer and Bureau <br />of Reclamation (RR) personnel to ensure protection <br />of [he environment. Reclamation inspectors would <br />advise the UYWCD of pate n[ial violations of 5uth <br />requirements and activities not in compliance with <br />the Environmental Commitment Plan and/or <br />Environmental Checklist, Federal and State <br />regulations, and 404 permit conditions. <br />Uncorrected prohlems in violation would be <br />reported to the appropriate Federal, State, or <br />local agency by ftec lama[fon. UYWCD will report <br />quarterly to COE of status and schedule of <br />construction. <br />47, UYWCD will regoi re Che protect contractor and FES <br />subcontractors [o comply with applicable Fed r. ral, 404 <br />State, local laws, regulations, and permits <br />Concerning the control and abatement of water, air <br />and noise pollutionand erosion. (An <br />Envi ronmentaL Commitment Checklist will be <br />prepared and carried out For each solicitation. <br />All contractors will comply with req uirement5 of <br />the 401 State Certification Program and provide <br />and implement an erosion control plan that will <br />comply with State requirements for erosion control <br />dams and with the Colorado Pollutant Discharge <br />Elimination System permit.) <br />19, ZI <br />25 <br />X X X <br />X X X <br />x x <br />x x <br />20,21,L9, X X <br />214, 25J, <br />255,]57, <br />J58 <br />UYWCD, DOP, <br />DOW (GJ150) <br />(GJ450) <br />UYWCD (GJ 150) <br />UYWCD (GJI50) <br /> <br />Comments <br />and <br />Commitment Status <br />actually been done by UYWCD. So <br />5100,000 will be deducted tram the <br />total amount of this tommitment.- <br />UYWCD, OR, Co.-11/IJ/87 Norti[a ri ng is continuing <br />Stale Eng. as per commitment. <br />(GJI50) <br />UYWCD (GJ150) -5/18/87 Included in sPecif is ations. <br />11 <br />