My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00273
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:15 AM
Creation date
10/5/2006 11:47:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153368
Contractor Name
Cache LaPoudre Water Development Study
Water District
0
County
Larimer
Bill Number
SB 81-439
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I I <br />I <br /> I <br /> Figure 1-1 <br /> I Figure II-1 <br /> Figure II-2 <br /> Figure II-3 <br /> I Figure II-4 <br /> Figure II-5 <br /> Figure II-6 <br /> I Figure III-1 <br /> Figure III-2 <br /> I Figure II 1-3 <br /> Figure 1II-4 <br /> I Figure 1II-5 <br /> Figure 1II-6 <br /> Figure III-7 <br /> I Figure IV-1 <br />, Figure IV-2 <br />I I <br /> Figure IV-3 <br /> I Figure IV-4 <br /> Figure IV-5 <br /> Figure IV-6 <br /> Figure IV-7 <br /> I Figure IV-8 <br /> Figure IV-9 <br /> I Figure V-1 <br /> Figure V-2 <br /> Figur e V-3 <br /> ~' igure V-4 <br /> I <br /> Figure VII-1 <br /> Figure VII-2 <br /> I Figure VI 1-3 <br /> Figure VII-4 <br /> Figure VI 1-5 <br /> I ~' igure VII-6 <br /> Figure VII-7 <br /> Figure VII-8 <br /> I Figur e VIII-1 <br /> Figure VIII-2 <br /> I <br /> I <br /> <br />CACHE LA POODRB PBOJBCT <br />RBCOIINAISSANCB RBPORl' <br />LIST OF FIGURES <br /> <br />Cache la Poudre River Basin <br />Cache la Poudre River Basin <br />Segments of the Cache la Poudre River Corridor <br />Schematic of Existing Cache la Poudre Water Facilities <br />Lower Basin cache la Poudre River <br />Reliability Council Regions <br />Western Systems Coordinating Council Regions <br /> <br />Cache la Poudre River Catchment <br />Upstream From Mouth of the Canyon <br />Recorded Annual Streamflow at Mouth of the Canyon <br />Transrnountain Diversions into Upstream Catchment From Mouth <br />of the Canyon <br />Colorado-Big Thompson Project Annual Delivery to Basin <br />Major Diversions From Upstream Catchment From Mouth of the <br />Canyon <br />Native Flows at Mouth of the Canyon <br />Inflow Design Floods <br /> <br />Rural Domestic Water Systems; Larimer, Boulder and Weld <br />Counties <br />Average Monthly Diversions, Fort Collins and Greeley Pipe- <br />lines <br />Irrigated Acres Existing in 1980 <br />Water Balance for Irrigated Land <br />Typical weekly Load Curve, 1980 System Load Data <br />Typical Weekly Load-Duration Curve, 1980 system Load Data <br />Typical Weekly Load-Duration Curve, 1990 System Load Data <br />Typical Weekly Load-Duration Curve, 2000 System Load Data <br />Rocky ~~untain Power Area Projected Peak Load 1982 - 2001 <br /> <br />Preliminary Alternative project Configurations <br />Model Configuration Alternative 1 <br />Model Configuration Alternative 6 <br />Model Configuration Future Without Project <br /> <br />Grey Mountain Dam <br />New Seaman Dam <br />Elkhor n Dam <br />Idylw ilde Dam <br />Preliminary Alternative 1 <br />Preliminary Alternative 8 <br />Preliminary Alternative 2 <br />Preliminary Alternative 7 <br /> <br />Projected Schedule of Development Activities <br />Conceptual Cash Flow Diagram <br /> <br />viii <br />
The URL can be used to link to this page
Your browser does not support the video tag.