Laserfiche WebLink
<br />r--- <br /> <br />woodward-CIA <br /> <br />.' <br /> <br />Planning <br /> <br />· Site selection studies and site investigations <br />· Engineering geology studies <br />· Risk and hazard assessments <br />· Water resource evaluations <br /> <br />Design <br /> <br />. Earth, rockfill, concrete, roller compacted concrete, and tailings dam <br />design, plans, and specifications <br />· Geotechnical analyses and design <br />· Designs of dam safety modifications <br />· Appurtenant structure design <br />. Safety inspection and analysis of existing dams <br />· Earthquake engineering <br />. Hydrology studies <br />. Hydraulic analyses and design <br />. Instrumentation systems <br />· Rock engineering <br />. Foundation design recommendations <br />. Tunnel and underground facility design <br />. Material characterization and laboratory testing <br />. Stream bed and bank stabilization <br />. Fish hatcheries, fishways, fish screens, and spawning channels <br />· Economic analysis <br />. Reclamation planning and design <br /> <br />Woodward-Clyde Consultants <br /> <br />23360/PRO.3 12-08-93(8;S3am)/RPT <br /> <br />3-3 <br />