My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00266
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00266
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:07:08 AM
Creation date
10/5/2006 11:46:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153644
Contractor Name
Harris Water Engineeering Company
Water District
0
County
Statewide
Bill Number
HB 93-1273
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />A general plan of development for each dam site will be developed. <br />The facilities required to store water and convey water to the <br />particular use will be identified; however, appraisal designs will <br />only be prepared for the dam and reservoir and any facilities <br />necessary to convey water to the reservoir (e.g. off-stream <br />reservoirs). Engineering designs will not be prepared for <br />facilities to convey water from the reservoir. <br /> <br />The appraisal designs will be based on the best available <br />information, and will address: <br /> <br />* description of a plan to incorporate the reservoir <br />into an overall water supply development for the area, <br /> <br />* estimate of average monthly water demand, <br /> <br />* estimate of dry year(s) inflow to reservoir, <br /> <br />* preparation of a reservoir elevation-area-capacity <br />table <br /> <br />* monthly computer reservoir operation study to size the <br />reserVOl.r and determine yield which incorporates the <br />water demand and the dry year(s) inflow, <br /> <br />* determination of the inflow design flood, <br /> <br />* computer reservoir operation study to determine <br />surcharge capacity and spillway capacity, <br /> <br />* determination of dam height from water demand/water <br />supply and inflow design flood operation studies, <br /> <br />* determination of spillway location and width, <br /> <br />* determination of outlet works capacity based on water <br />demand and dam safety criteria, <br /> <br />* appraisal design of the dam embankment, (For purposes <br />of this proposal, it is assumed that most if not all of <br />the embankments will be earth fill, realizing that there <br />may be sites which could utilize roller compacted <br />concrete, gravity concrete dam, or other types of dam <br />structures. unless the embankment is obviously not <br />suitable as earth fill, HWE proposes to base the design <br />on earth fill. If another type of embankment structure <br />is necessary, HWE will prepare an appraisal design on the <br />required structure.), <br /> <br />* appraisal design of facilities to convey water to the <br />reservoir in the case of off-stream reservoirs, <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.